All stormwater management elements of the roadway within the project boundaries shall be designed in accordance with the requirements of Chapter 15.45 LCC, Stormwater Management.
(Ord. 1194 Exh. B, 2007)
(1) 
Vaned grates shall be utilized on grades in excess of 10 percent.
(2) 
Surface drainage from approaches must be diverted or mitigated by the applicant unless otherwise stated in the road approach permit. The minimum size of the approach culvert shall not be smaller than 12 inches in diameter.
(Ord. 1194 Exh. B, 2007)