Environmental protection issues including air quality, water quality, and water quantity are addressed by mitigation measures included in the Final Environmental Project Statement (FEIS) published on July 14, 2004. To further protect air quality, the project shall obtain air quality permits from the Washington State Department of Ecology ("Ecology") and the Southwest Washington Clean Air Agency ("SWCAA"). To further protect water quality and quantity, any groundwater withdrawn for this specific major industrial development shall require necessary permits from Ecology or the Lewis County water conservancy board. To further protect water quality and quantity. stormwater shall be managed as required by Chapter
15.45 LCC; provided, however, stormwater management for this specific major industrial development shall be designed for the 100-year, 24-hour storm event.
(Ord. 1179H § 1, 2004)