This section contains the basic requirements that apply to the SEPA process. The county adopts the following sections as now or hereafter amended of Chapter 197-11 WAC by reference, as supplemented or modified in this section:
WAC 197-11-040 | Definitions. |
WAC 197-11-050 | Lead agency. |
WAC 197-11-055 | Timing of the SEPA process. |
WAC 197-11-060 | Content of environmental review. |
WAC 197-11-070 | Limitations on actions during SEPA process. |
WAC 197-11-080 | Incomplete or unavailable information. |
WAC 197-11-090 | Supporting documents. |
WAC 197-11-100 | Information required of applicants. |
WAC 197-11-158 | GMA project review-reliance on existing plans and regulations. |
WAC 197-11-210 | SEPA/GMA integration. |
WAC 197-11-220 | SEPA/GMA definitions. |
WAC 197-11-228 | Overall SEPA/GMA integration procedures. |
WAC 197-11-230 | Timing of an integrated GMA/SEPA process. |
WAC 197-11-232 | SEPA/GMA integration procedures for preliminary planning, environmental analysis, and expanded scoping. |
WAC 197-11-235 | Documents. |
WAC 197-11-238 | Monitoring. |
WAC 197-11-250 | SEPA/Model Toxics Control Act (MTCA) integration. |
WAC 197-11-253 | SEPA lead agency for MTCA actions. |
WAC 197-11-256 | Preliminary evaluation. |
WAC 197-11-259 | Determination on nonsignificance for MTCA remedial actions. |
WAC 197-11-262 | Determination of significance and EIS for MTCA remedial actions. |
WAC 197-11-265 | Early scoping for MTCA remedial actions. |
WAC 197-11-268 | MTCA interim actions. |
(Ord. 1080 § 3 Preamble, 1984; Ord. 1157, 1998; Ord 1170B, 2000; Ord. 1170C § 1, 2001)