This section contains the rules for deciding whether a proposal has a "probable significant, adverse environmental impact" requiring an environmental impact statement (EIS) be prepared. This section also contains rules for evaluating the impacts of proposals not requiring an EIS. The county adopts the following sections as now or hereafter amended by reference, as supplemented or modified in this section:
WAC 197-11-300 | Purpose of this part. |
WAC 197-11-305 | Categorical exemptions. |
WAC 197-11-310 | Threshold determination required. |
WAC 197-11-315 | Environmental checklist. |
WAC 197-11-330 | Threshold determination process. |
WAC 197-11-335 | Additional information. |
WAC 197-11-340 | Determination of nonsignificance (DNS). |
WAC 197-11-350 | Mitigated DNS. |
WAC 197-11-355 | Optional DNS process |
WAC 197-11-360 | Determination of significance (DS)/initiation of scoping. |
WAC 197-11-390 | Effect of threshold determination. |
(Ord. 1080 § 4 Preamble, 1984; Ord. 1157, 1998; Ord. 1170B, 2000; Ord. 1170C § 3, 2001)