The City shall review an eligible facilities modification application to determine if the proposed facilities modification is subject to this chapter and, if so, if the proposed facilities modification will result in a substantial change to the physical dimensions of an eligible support structure.
A. Time Frame for Review. Within 60 days of the date on which the City receives an eligible facilities modification application, less any time period that may be excluded under the tolling provisions of this chapter or a tolling agreement between the applicant and the City, the City shall approve the application and issue an eligible facilities modification permit unless the City determines that the application is not subject to this chapter, or the proposed facilities modification will substantially change the physical dimension of an eligible support structure.
B. Approval – Denial. An eligible facilities application shall be approved, and an eligible facilities permit issued, upon determination by the City that the proposed facilities modification is subject to this chapter and that it does not substantially change the physical dimensions of an eligible support structure. An eligible facilities application shall be denied upon determination by the City that the proposed facilities modification is not subject to this chapter or will substantially change the physical dimensions of an eligible support structure. A proposed facilities modification will substantially change the physical dimensions of an eligible support structure if it meets any of the following substantial change criteria:
1. Changes in height shall be measured from the original support structure in cases where deployments are or will be separated horizontally, such as on buildings’ rooftops; in other circumstances, changes in height shall be measured from the dimensions of the tower or base station, inclusive of originally approved appurtenances and any modifications that were approved prior to the passage of the Spectrum Act;
2. For towers other than towers in the public rights-of-way, it involves adding an appurtenance to the body of the tower that would protrude from the edge of the tower more than 20 feet, or more than the width of the tower structure at the level of the appurtenance, whichever is greater; for other eligible support structures, it involves adding an appurtenance to the body of the structure that would protrude from the edge of the structure by more than six feet;
3. For any eligible support structure, it involves installation of more than the standard number of new equipment cabinets for the technology involved, but not to exceed four cabinets; or, for towers in the public rights-of-way and base stations, it involves installation of any new equipment cabinets on the ground if there are no preexisting ground cabinets associated with the structure, or else involves installation of ground cabinets that are more than 10 percent larger in height or overall volume than any other ground cabinets associated with the structure;
4. It entails any excavation or deployment outside the current site;
5. It would defeat the concealment elements of the eligible support structure; or
6. It does not comply with conditions associated with the siting approval of the construction or modification of the eligible support structure or base station equipment; provided, however, that this limitation does not apply to any modification that is noncompliant only in a manner that would not exceed the thresholds identified in this section.
C. Approved Application. An application that has been deemed approved shall be and constitute the equivalent of an eligible facilities modification permit, except as may be otherwise determined by a court of competent jurisdiction and shall be subject to generally applicable enforcement and compliance requirements in the same manner as an eligible facilities modification permit issued pursuant to this chapter.
D. Denial of Application. A denial of an eligible facilities modification application shall set forth in writing the reasons for the denial and shall be provided to the applicant.
E. Other Code Requirements. Any eligible facilities modification permit issued pursuant to this chapter, and any application that has been deemed approved, shall be and is conditioned upon compliance with any applicable building, structural, electrical, and safety codes and other laws codifying objective standards reasonably related to health and safety.
F. Term of Eligible Facilities Modification Permit. An eligible facilities modification permit issued pursuant to this chapter, and any deemed approved application, shall be valid for a term consistent with the time period provided for building permits in UPMC Title
14.
G. Remedies. Notwithstanding any other provisions in the City code, no administrative appeal is provided for review of a decision to condition, deny or approve an application. Applicant and the City retain any and all remedies that are available at law or in equity, including, by way of example and not limitation, those remedies set forth in the FCC Eligible Facilities Request Rules and remedies available under the Land Use Petition Act (Chapter
36.70C RCW). In the event no other time period is provided at law for bringing an action for a remedy, any action challenging a denial of an application or notice of a deemed approved remedy shall be brought within 30 days following the date of denial or following the date of notification of the deemed approved remedy.
(Ord. 751 § 3 (Exh. C), 2021)