The fee for each electrical permit shall be as set forth in Table 16.24.340 as herein provided.
Table 16.24.340 Electrical Permit Fees |
|---|
1. Residential Fees |
| a. | New single-family residence or complete rewire of existing: | |
| | 1) | 200 amps or less | $163 |
| | 2) | Over 200 amps | $207 |
| b. | Mobile home service and feeder, detached garages and outbuildings, swimming pools, and other similar installations not specifically identified. | $82 |
| c. | Service/panel change-out or adding a subpanel (including circuits). | $82 |
| d. | 200 amp panel altered to 400 amp (2-200 amp / 320 amps continuous). | $109 |
| e. | Meter/mast repair. | $54 |
| f. | Mobile home feeder, hot tubs, heat pumps, and similar installations. | $54 |
| g. | Circuits added/altered without service change: | |
| | 1) | 1 to 5 circuits | $54 |
| | 2) | 6 to 11 circuits (12 or more circuits, see line (1)(a) above) | $82 |
| h. | Low voltage: | |
| | 1) | Thermostat for air handler | $39 |
| | 2) | All others (exceptions: wireless security systems, data, phone and TV) | $54 |
| i. | Solar photovoltaic (PV) systems. | $143 |
2. Commercial, Multifamily, and Low Voltage Fees (Excepting stand-alone low voltage equipment cost) |
| Total valuation of electrical installation* Use this table for all low voltage also. |
| $500 or less | $64 |
| $501 to $5,000 | $64 + 2% of cost over $500 |
| $5,001 to $50,000 | $163 + 1% of cost over $5,000 |
| $50,001 to $250,000 | $654 + 0.4% of cost over $50,000 |
| $250,001 to $1,000,000 | $1,525 + 0.3% of cost over $250,000 |
| $1,000,001 and above | $3,976 + 0.15% of cost over $1,000,000 |
| * Typical cost of labor and materials used to complete the project whether donated or not. | |
3. Miscellaneous Residential, Multifamily, and Commercial Fees |
| a. | Temporary services, for every 200 amp or portion thereof. | $54 |
| b. | Carnival/Amusement rides. | $216 |
| c. | Annual permit: | |
| | 1) | For 1 to 4 electricians | $1,905 |
| | 2) | Low voltage | $272 |
| d. | Trip fee in addition to existing permit or re-inspection fee as needed. | $64 |
| e. | Signs: | |
| | 1) | The first sign | $54 |
| | 2) | Each additional sign inspected at the same time | $16 |
| f. | Variance application fee. | $82 |
| g. | Inspections for which no fee is specifically indicated (minimum charge – one-half hour) | $62 |
4. Plan Review Requirements |
| a. | All commercial and multifamily projects over 400 amps will require a preliminary plan review. |
| b. | Projects not qualified by a preliminary plan review shall be required to submit two sets of drawings detailing the scope of work in floor plan view and a complete one-line. |
| c. | Plan review is required for all educational, institutional or health or personal care facilities as outlined in Chapter 296-46B WAC. |
5. Plan Review Fees |
| a. | Preliminary plan review by appointment (fee may be applied to permit or regular plan review if needed). | $64 |
| b. | Regular plan review, 15% of permit fee. | Minimum charge | $82 |
| c. | WAC-required plan review, 20% of permit fee plus | Minimum charge | $82 |
6. Civil Penalties |
| a. | Work performed without required permit (exception: emergency repairs) and other violations shall be subject to the penalties identified in LMC § 16.24.360. |