Prior to acceptance of streets and city utilities by the city, and other utilities by other agencies, the streets and utilities shall be inspected for the following, at a minimum:
A.
Streets shall be inspected for:
C.
Sanitary sewer shall be inspected for:
1.
Compliance with approved construction documents.
2.
Sight lines.
3.
Hydrostatic or air test.
4.
Mandrel test.
5.
The major trunk line, lateral lines and manholes must be in and TV'd and accepted or with only minor adjustments remaining prior to seeking bond. Bond is intended for minor adjustments only.
D.
Potable water, fire flow water and fire hydrants shall be inspected for:
E.
Tentative plan development conditions shall be inspected and approved by the public works director.
F.
Inspections of telephone lines, cable TV, power lines, gas lines, irrigation facilities and other facilities shall be inspected by an agency determined to be responsible by the public works director.
(Ord. 11-373-O § 8-7:5.410)