Design for a sanitary sewer, potable and fire flow water, storm drainage, grading and erosion control, and other utilities must be reviewed and approved by the city engineer and the public works director. Fire lines and fire hydrants including placement, size and type, and proposed water pressure shall be reviewed and approved by the fire district fire marshal. Water system design and extension shall conform to the adopted water plan, official water system map, and the city of Rogue River water standards and shall be approved by Oregon Department of Human Services Public Health Division. Sewer system design shall conform to the adopted sewer plan, official sewer system map, and shall be approved by the Department of Environmental Quality. Storm drain and drainage way design shall be consistent with the city's master storm drainage facilities plan and official storm drainage map, shall take into account the capacity and grade necessary to maintain unrestricted flow from areas draining through the use or development, and to allow extension of the system outside the use or development. Grants Pass Irrigation District shall be consulted regarding any improvements on the property in which they have an interest. All utilities shall be placed underground. The applicant shall make necessary arrangements with the utility companies or other persons or corporations affected for the installation of underground lines and facilities. Construction document submittal and review shall be per Article III of Chapter
16.25 RRMC. Construction acceptance and bonding for completion and maintenance, as well as fees, assessments and system development charges, shall be per Chapter
16.25 RRMC.
(Ord. 11-373-O § 8-7:8.160)