In addition to any other penalties provided in this chapter, any person who violates any of the provisions of this chapter, including, but not limited to, constructing, placing or erecting any structure or any other manmade device or artifice on or over the public right-of-way without first obtaining a right-of-way use permit, shall have committed a civil infraction and, upon a determination by the Poulsbo municipal court that such infraction has been committed, shall pay a civil monetary penalty to the city in a sum not to exceed two hundred fifty dollars. In addition, each and every day during any portion of which any violation of any provision of this chapter is committed, continued or permitted by any such person constitutes a separate infraction. The planning director or his designee may remove any structure or obstruction constructed, placed or erected on the public right-of-way without benefit of a right-of-way use permit, the cost and expense of which shall be assessed as a personal obligation of the person constructing, erecting or placing such structure or obstruction.
(Ord. 85-18 § 9, 1985; Ord. 2021-09 § 2 (Att. A), 2021)