The International Building Code, 2021 Edition, as published by the International Code Council, together with Appendix E, together with all Washington State amendments as contained in Chapter 51-50 WAC, and together with the applicable references to the National Fire Protection Association (NFPA), current edition and as amended, is hereby adopted as modified by GFMC § 15.02.020, § 15.02.030, and § 15.02.040, and below in this section.
Section 105.2 shall be revised to add the following items:
#14. Platforms not more than 30 inches above the grade and not over any basement or story below. |
#15. Replacement of nonstructural siding on IRC structures except for veneer, stucco, or exterior finish and insulation systems (EIFS). |
#16. In-kind window replacement for IRC structures where no alteration of structural members is required and which the window U values meet the prescriptive requirements within the Washington State Energy Code. |
#17. Job shacks that are placed at a permitted job site during construction may be allowed on a temporary basis and shall be removed upon final approval of construction. |
#18. In-kind reroofing of one and two family dwellings provided roof sheathing is not removed or replaced. |
Section 105.3.2 shall be revised as follows:
1. Applications for which no permit is issued within 18 months following the date of application shall expire by limitation and plans and other data submitted for review may thereafter be returned to the applicant or destroyed in accordance with state law. |
2. Applications may be cancelled for inactivity, if an applicant fails to respond to the department's written request for revisions, corrections, actions or additional information within 90 days of the date of request. The building official may extend the response period beyond 90 days. |
Section 105.5 shall be revised as follows:
Time limitation on building permits: |
1. Every permit issued shall expire two years from the date of issuance. The building official may approve a request for an extended expiration date where a construction schedule is provided by the applicant and approved prior to permit issuance. |
2. Every permit that has been expired for one year or less may be renewed for a period of one year for an additional fee as long as no changes have been made to the originally approved plans. For permits that have been expired for longer than one year, a new permit must be obtained and new fees paid. No permit shall be renewed more than once. |
(Ord. 913 § 1 (Exh. A), 2016; Ord. 1002 § 1 (Exh. A), 2021; Ord. 1049 § 1 (Exh. A), 2024)