APPROVAL: | The proposed work or completed work conforms to this article in the opinion of the director. |
BASIN PLAN: | A plan and all implementing regulations and procedures including, but not limited to, land use management adopted by ordinance for managing surface and storm water management facilities and features within individual subbasins. |
BEST MANAGEMENT PRACTICE OR BMP: | Physical, structural, and/or managerial practices that, when used singly or in combination, prevent or reduce pollution of water. BMPs are listed and described in the manual. |
CIVIL ENGINEER: | A professional engineer licensed in the state of Washington in civil engineering. |
CIVIL ENGINEERING: | The application of the knowledge of the forces of nature, principles of mechanics and the properties of materials to the evaluation, design and construction of civil works for the beneficial uses of mankind. |
CLEARING: | The destruction and removal of vegetation by manual, mechanical, or chemical methods. |
COMMERCIAL AGRICULTURE: | Those activities conducted on lands defined in Revised Code of Washington 84.34.020(2), and activities involved in the production of crops or livestock for wholesale trade. An activity ceases to be considered commercial agriculture when the area on which it is conducted is proposed for conversion to a nonagricultural use or has lain idle for more than five (5) years, unless the idle land is registered in a federal or state soils conservation program, or unless the activity is maintenance of irrigation ditches, laterals, canals, or drainage ditches related to an existing and ongoing agricultural activity. |
CRITICAL AREAS: | At a minimum, areas which include wetlands, areas with a critical recharging effect on aquifers used for potable water, fish and wildlife habitat conservation areas, frequently flooded areas, geologically hazardous areas, including unstable slopes, and associated areas and ecosystems. |
DESIGN STORM: | A prescribed hyetograph and total precipitation amount (for a specific duration recurrence frequency) used to estimate runoff for a hypothetical storm of interest or concern for the purpose of analyzing existing drainage, designing new drainage facilities or assessing other impacts of a proposed project on the flow of surface water. (A "hyetograph" is a graph of percentages of total precipitation for a series of time steps representing the total time during which the precipitation occurs.) |
DETENTION: | The release of storm water runoff from the site at a slower rate than it is collected by the storm water facility system, the difference being held in temporary storage. |
DETENTION FACILITY: | An above or belowground facility, such as a pond or tank, that temporarily stores storm water runoff and subsequently releases it at a slower rate than it is collected by the drainage facility system. There is little or no infiltration of stored storm water. |
DRAINAGE BASIN: | A geographic and hydrologic subunit of a watershed. |
EARTH MATERIAL: | Any rock, natural soil or fill and/or any combination thereof. |
ECOLOGY: | The Washington state department of ecology. |
EROSION: | The wearing away of the land surface by running water, wind, ice, or other geological agents, including such processes as gravitational creep; detachment and movement of soil or rock fragments by water, wind, ice, or gravity. |
EXCAVATION: | The mechanical removal of earth material. |
EXISTING SITE CONDITIONS: | A. For developed sites with storm water facilities that have been constructed to meet the standards in the minimum requirements of this article, "existing site conditions" shall mean the existing conditions on the site. |
| B. For developed sites that do not have storm water facilities that meet the minimum requirements of the manual adopted in subsection 10-6A-10A of this article, "existing site conditions" shall mean the conditions that existed prior to local government adoption of a storm water management program. If in question, the existing site conditions shall be documented by aerial photograph records, or other appropriate means. |
| C. For all sites in water quality sensitive areas as identified under minimum requirement 7, water quality sensitive areas2, "existing site conditions" shall mean undisturbed forest, for the purpose of calculating runoff characteristics. |
| D. For all undeveloped sites outside of water quality sensitive areas, "existing site conditions" shall mean the existing conditions on the site. |
EXPERIMENTAL BMP: | A BMP that has not been tested and evaluated by the state department of ecology in collaboration with local governments and technical experts. |
FILL: | A deposit of earth material placed by artificial means. |
FOREST PRACTICE: | Any activity conducted on, or directly pertaining to, forest land and relating to growing, harvesting, or processing timber, including, but not limited to: road and trail construction; harvesting, final and intermediate; precommercial thinning; reforestation; fertilization; prevention and suppression of diseases and insects; salvage of trees and brush control. |
FREQUENTLY FLOODED AREAS: | The 100-year floodplain designations of the federal emergency management agency and the national flood insurance program. |
GEOLOGICALLY HAZARDOUS AREAS: | Areas that, because of their susceptibility to erosion, sliding, earthquake or other geological events, are not suited to the siting of commercial, residential or industrial development consistent with public health or safety concerns. |
GRADE: | The slope of a road, channel, or natural ground. The finished surface of a canal bed, roadbed, top of embankment, or bottom of excavation; any surface prepared for the support of construction such as paving or the laying of a conduit. |
To Grade: | To finish the surface of a canal bed, roadbed, top of embankment or bottom of excavation. |
GROUND WATER: | Water in a saturated zone or stratum beneath the surface of land or a surface water body. |
HYDROPERIOD: | The seasonal occurrence of flooding and/or soil saturation; it encompasses depth, frequency, duration, and seasonal pattern of inundation. |
ILLICIT DISCHARGE: | All nonstorm water discharges to storm water drainage systems that cause or contribute to a violation of state water quality, sediment quality or ground water quality standards, including, but not limited to, sanitary sewer connections, industrial process water, interior floor drains, car washing and grey water systems. |
IMPERVIOUS SURFACE: | A hard surface area which either prevents or retards the entry of water into the soil mantle as under natural conditions prior to development, and/or a hard surface area which causes water to run off the surface in greater quantities or at an increased rate of flow from the flow present under natural conditions prior to development. Common impervious surfaces include, but are not limited to, roof tops, walkways, patios, driveways, parking lots or storage areas, concrete or asphalt paving, gravel roads, packed earthen materials, and oiled, macadam or other surfaces which similarly impede the natural infiltration of storm water. Open, uncovered retention/detention facilities shall not be considered as impervious surfaces. |
INTERFLOW: | That portion of precipitation that infiltrates into the soil and moves laterally through the upper soil horizons until intercepted by a stream channel or until it returns to the surface; for example, in a wetland, spring or seep. |
LAND DISTURBING ACTIVITY: | Any activity that results in a change in the existing soil cover (both vegetative and nonvegetative) and/or the existing soil topography. Land disturbing activities include, but are not limited to, demolition, construction, clearing, grading, filling and excavation. |
LARGE PARCEL EROSION AND SEDIMENT CONTROL PLAN OR LARGE PARCEL ESC PLAN: | A plan to implement BMPs to control pollution generated during land disturbing activity. Guidance for preparing a large parcel ESC plan is contained in the manual. |
MITIGATION: | In the following order of preference: |
| A. Avoiding the impact altogether by not taking a certain action or part of an action; |
| B. Minimizing impacts by limiting the degree or magnitude of the action and its implementation, by using appropriate technology, or by taking affirmative steps to avoid or reduce impacts; |
| C. Rectifying the impact by repairing, rehabilitating or restoring the affected environment; |
| D. Reducing or eliminating the impact over time by preservation and maintenance operations during the life of the action; and |
| E. Compensation for the impact by replacing, enhancing, or providing substitute resources or environments. |
NATURAL LOCATION: | The location of those channels, swales, and other nonmanmade conveyance systems as defined by the first documented topographic contours existing for the subject property, either from maps or photographs, or such other means as appropriate. |
NEW DEVELOPMENT: | The following activities: land disturbing activities, structural development, including construction, installation or expansion of a building or other structure; creation of impervious surfaces; class IV - general forest practices that are conversions from timberland to other uses; and "subdivision" and "short subdivision" of land as defined in Revised Code of Washington 58.17.020. All other forest practices and commercial agriculture are not considered new development. |
PERMANENT STORM WATER QUALITY CONTROL (PSQC) PLAN: | A plan which includes permanent BMPs for the control of pollution from storm water runoff after construction and/or land disturbing activity has been completed. For small sites, this requirement is met by implementing a small parcel erosion and sediment control plan. Guidance on preparing a PSQC plan is contained in the manual. |
PERSON: | Any individual, partnership, corporation, association, organization, cooperative, public or municipal corporation, agency of the state, or local government unit, however designated. |
POLLUTION: | Contamination or other alteration of the physical, chemical, or biological properties, of waters of the state, including change in temperature, taste, color, turbidity, or odor of the waters, or such discharge of any liquid, gaseous, solid, radioactive or other substance into any waters of the state as will or is likely to create a nuisance or render such waters harmful, detrimental or injurious to the public health, safety or welfare, or to domestic, commercial, industrial, agricultural, recreational, or other legitimate beneficial uses, or to livestock, wild animals, birds, fish or other aquatic life. |
REDEVELOPMENT: | On an already developed site, the creation or addition of impervious surfaces, structural development including construction, installation or expansion of a building or other structure, and/or replacement of impervious surface that is not part of a routine maintenance activity, and land disturbing activities associated with structural or impervious redevelopment. |
REGIONAL RETENTION/DETENTION SYSTEM: | A storm water quantity control structure designed to correct existing excess surface water runoff problems of a basin or subbasin. The area downstream has been previously identified as having existing or predicted significant and regional flooding and/or erosion problems. This term is also used when a detention facility is used to detain storm water runoff from a number of different businesses, developments or areas within a catchment. |
RETENTION/DETENTION FACILITY (R/D): | A type of drainage facility designed either to hold water for a considerable length of time and then release it by evaporation, plant transpiration, and/or infiltration into the ground; or to hold surface and storm water runoff for a short period of time and then release it to the surface and storm water management system. |
SITE: | The portion of a piece of property which is directly subject to development. |
SLOPE: | The degree of deviation of a surface from the horizontal; measured as a numerical ratio, percent, or in degrees. Expressed as a ratio, the first number is the horizontal distance (run) and the second is the vertical distance (rise), as 2:1. A 2:1 slope is a fifty percent (50%) slope. Expressed in degrees, the slope is the angle from the horizontal plane, with a ninety degree (90°) slope being vertical (maximum) and forty five degrees (45°) being a 1:1 or one hundred percent (100%) slope. |
SMALL PARCEL EROSION AND SEDIMENT CONTROL PLAN OR SMALL PARCEL ESC PLAN: | A plan for small sites to implement temporary BMPs to control pollution generated during the construction phase only, primarily erosion and sediment. Guidance for preparing a small parcel ESC plan is contained in the manual. |
SOIL: | The unconsolidated mineral and organic material on the immediate surface of the earth that serves as a natural medium for the growth of land plants. |
SOURCE CONTROL BMP: | A BMP that is intended to prevent pollutants from entering storm water. A few examples of source control EMPs are erosion control practices, maintenance of storm water facilities, constructing roofs over storage and working areas, and directing wash water and similar discharges to the sanitary sewer or a dead end sump. |
STORM WATER: | That portion of precipitation that does not naturally percolate into the ground or evaporate, but flows via overland flow, interflow, channels or pipes into a defined surface water channel, or a constructed infiltration facility. |
STORM WATER DRAINAGE SYSTEM: | Constructed and natural features which function together as a system to collect, convey, channel, hold, inhibit, retain, detain, infiltrate, divert, treat or filter storm water. |
STORM WATER FACILITY: | A constructed component of a storm water drainage system, designed or constructed to perform a particular function, or multiple functions. Storm water facilities include, but are not limited to, pipes, swales, ditches, culverts, street gutters, detention basins, retention basins, constructed wetlands, infiltration devices, catchbasins, oil/water separators, sediment basins and modular pavement. |
STORM WATER MANAGEMENT MANUAL OR MANUAL: | The manual adopted by reference and prepared by ecology that contains BMPs to prevent or reduce pollution. |
STORMWATER SITE PLAN: | A plan which includes an erosion and sediment control (ESC) plan and/or a permanent stormwater quality control plan (PSQCP). For small sites, this plan is the equivalent of a small parcel erosion and sediment control plan. Guidance on preparing a stormwater site plan is contained in the manual. |
TREATMENT BMP: | A BMP that is intended to remove pollutants from stormwater. A few examples of treatment BMPs are detention ponds, oil/water separators, biofiltration swales and constructed wetlands. |
UNSTABLE SLOPES: | Those sloping areas of land which have in the past exhibited, are currently exhibiting, or will likely in the future exhibit, mass movement of earth. |
VEGETATION: | All organic plant life growing on the surface of the earth. |
WATER BODY: | Surface waters including rivers, streams, lakes, marine waters, estuaries, and wetlands. |
WATERSHED: | A geographic region within which water drains into a particular river, stream, or body of water as identified and numbered by the state of Washington water resource inventory areas (WRIAs) as defined in Washington administrative code chapter 173-500. |
WETLANDS: | Those areas that are inundated or saturated by surface or ground water at a frequency and duration sufficient to support, and that under normal circumstances do support, a prevalence of vegetation typically adapted for life in saturated soil conditions. Wetlands generally include swamps, marshes, bogs, and similar areas. This includes wetlands created, restored or enhanced as part of a mitigation procedure. This does not include constructed wetlands or the following surface waters of the state intentionally constructed from sites that are not wetlands: irrigation and drainage ditches, grass lined swales, canals, agricultural detention facilities, farm ponds, and landscape amenities. |