[Ord. 89-319; Ord. 91-388, § 2; Ord. 92-471C, § 1; Ord. 93-483A, § 1; Ord. 01-917, § 8; Ord. 02-979; Ord. 02-974; Ord. 03-1019, § 3; Ord. 03-999; Ord. 05-1081, § 1; Ord. 05-1083, § 1; Ord. 07-1138, § 4; Ord. 07-1147B, § 10; Ord. 08-1195; Ord. 08-1197A; Ord. 14-1337; Ord. 16-1389; Ord. 22-1478; Ord. 23-1498]
(a) The Chief Operating Officer may execute an agreement between Metro and a designated facility located outside the jurisdictional boundary for any solid waste that Council approves pursuant to Section
5.05.070. This authority includes any later amendments to the agreement.
(b) An agreement between Metro and a designated facility must specify the types of waste that the facility can accept from within the Metro jurisdictional boundary.
(c) An agreement between Metro and a designated facility may not authorize the acceptance of non-putrescible waste originating or generated within the Metro jurisdictional boundary if the waste has not yet undergone material recovery, unless:
(1) The designated facility receives non-putrescible waste from a facility that Metro has issued a license or franchise pursuant to Chapter
5.01 authorizing such facility to perform material recovery on non-putrescible waste;
(2) The designated facility receives non-putrescible waste from a designated facility that has an agreement with Metro authorizing it to perform material recovery on non-putrescible waste; or
(3) The designated facility and Metro have an agreement authorizing the facility to perform material recovery on non-putrescible waste pursuant to subsection (d).
(d) Any agreement between Metro and a designated facility that authorizes the facility to accept non-putrescible waste that (i) has not yet undergone material recovery, (ii) is not comprised of processing residual, and (iii) originated or generated within the Metro jurisdictional boundary, must:
(1) Require the designated facility to perform material recovery on the waste; and
(2) Demonstrate, in a manner that can be verified and audited, that the processing achieves material recovery substantially comparable to that required of an in-region material recovery facility under Metro Code Section
5.01.260 by either:.
(A) Meeting the material recovery requirements for all non-putrescible waste received at the facility, whether or not from within the Metro jurisdictional boundary; or
(B) Keeping all non-putrescible waste received from within the Metro jurisdictional boundary segregated from other waste throughout processing, keeping processing residual from such processing segregated from other solid waste after processing, and meeting such material recovery requirements for all such non-putrescible waste.
(3) Demonstrate, in a manner that can be verified and audited, that the facility substantially complies with:
(B) The rules, performance standards, design requirements, and operating requirements applicable to licensed and franchised material recovery facilities operating within the Metro jurisdictional boundary and adopted by Metro as administrative rules pursuant to Metro Code Chapter
5.08.