To protect the health and safety of the citizens of West Richland and the integrity of streets, easements, and rights-of-way of the city, no public street, road, easement or right-of-way may be cut or excavated without a permit issued by the city.
A.
Street Cuts – Permits – Application Requirements and Procedures.
1.
The application for a permit shall be submitted to the city clerk treasurer.
2.
Only those entities holding current franchises with the city and/or licensed, bonded or insured contractors will be allowed to perform street cut work within city streets.
3.
Application for a permit to cut city streets shall be made on a form provided by the city building department.
4.
Applications for the permit shall be completed by the applicant with sufficient detail and clarity to describe the full scope of the project.
5.
The permit shall be issued by the city administrator or his designee.
7.
Permit holder shall notify the city building inspector 24 hours in advance of the commencement of work.
8.
Street cut repairs shall be completed in accordance with city street excavations and repair specifications. The permit holder shall ensure that all applicable municipal code provisions are followed.
B.
For a one-year period following acceptance of the street cut repair by the city, the applicant shall be responsible for its maintenance, repair or replacement if deemed necessary by the city.
C.
Each applicant shall be assessed the permit fee as set by city council in the master fee schedule per permit, which amount shall be payable prior to the time a permit is issued, for the purpose of inspection and administration by the city. Only one street cut per permit is allowed.
(Ord. 13-93 § 1, 1993; Ord. 35-93 § 1, 1993; Ord. 16-14 § 2 (Att. B), 2014)