In cases where construction of water, sewer or storm sewer system improvements is part and parcel of a subdivision or any other development, construction plans stamped by a registered engineer must be submitted to the director for review and approval in accordance with city standards and specifications. The appropriate number of copies of such preliminary plans, as noted in the city standards, shall be submitted to the director for plan review and approval by department personnel or their designees. Plan review and inspection fees are as follows:
Plan review | ||
• Base fee | $500.00 | Plus cost recovery1 |
• Additional fee | $50.00/lot2 | |
Construction inspection | ||
• Base fee | $1,000.00 | Plus cost recovery1 |
• Additional fee | $100.00/lot2 | |
1Actual cost of consultant review. |
2For five or more lots. |
(Formerly 13.24.030; Ord. 1140 § 1, 1994; Ord. 1458 § 1, 2003; Ord. 1512 § 1, 2005; Ord. 1534 § 1, 2005; Ord. 1609 § 1 (Exh. A), 2008; Ord. 1880 § 2 (Exh. B), 2019)