This chapter shall be known as the building code of the city.
(Ord. 544 § 1, 1975; Ord. 963 § 1, 1989; Ord. 1368 § 1, 1999; Ord. 1421, 2001; Ord. 1451 § 1, 2003; Ord. 1490 § 1, 2004; Ord. 1604 § 1 (Exh. F), 2008)
i. Freestanding decks less than 30" above grade (see IRC 105.2.5). |
Fees shall be determined in accordance with WMC Chapter 3.97, Building Fees. |
Roof Snow Load | Wind Speed (Gust) | Seismic Design Category | Weath-ering | Frost Line Depth | Term-ites | Decay | Winter Design Temp | Ice Shield Under-lay | Flood Hazard | Air Freeze Index | Mean Annual Temp |
|---|---|---|---|---|---|---|---|---|---|---|---|
25 lbs./ft2 | 105 MPH 3 second | D-1 | Moderate | 12" | Slight | Moderate | 22 deg. F | No | * | 250 | 50 deg. |
* See FEMA Maps of the local area. |
Fees shall be determined in accordance with WMC Chapter 3.97, Building Fees. |
(i) Not more than 80% of the permit fee paid when no work has been done under a permit issued in accordance with this code. |
(ii) Not more than 80% of the plan review fee paid when an application for a permit for which a plan review fee has been paid is withdrawn or canceled before any plan review effort has been expended. |
Fees shall be determined in accordance with WMC Chapter 3.97, Building Fees. |
When a plan or other data are required to be submitted, a plan review fee shall be paid at the time of submitting plans and specification for review. The plan review fee for plumbing work shall be equal to 65 percent of the total permit fee as set forth in WMC § 3.97.020 (Plumbing Permit Fees). When plans are incomplete or changed so as to require additional review, a fee shall be charged at the rate shown in WMC § 3.97.020 (Plumbing Permit Fees). |
The Building Official may authorize refunding of not more than 80 percent of the plan review fee paid when an application for a permit for which a plan review has been paid is withdrawn or canceled before any plan review effort has been expended. |
The Building Official shall not authorize the refunding of any fee paid except upon a written application filed by the original permittee not later than one hundred and eighty (180) days after the date of fee payment. |