A.
IMC Section 101.1 is amended as follows:
101.1 Title. These regulations shall be known as the Kitsap County Mechanical Code, hereinafter referred to as “this code.” |
B.
IMC Section 106.4.3 is amended as follows:
106.4.3 Expiration. Every permit issued shall become invalid unless the work authorized by such permit is commenced within 365 days after its issuance, or if the work authorized by such permit is suspended or abandoned for a period of 180 days after the time the work is commenced. Having required inspections performed and approved within every 180 days is evidence that work has commenced and is continuing. Permits that do not receive an inspection within 180 days of permit issuance, or within 180 days since the previous approved inspection, shall automatically expire and become invalid. The building official is authorized to grant, in writing, one or more extensions of time, for periods not more than 180 days each, based on good and satisfactory reasons. The extension shall be requested in writing prior to permit expiration, and shall demonstrate good cause. |
C.
IMC Section 106.4.4 is deleted.
D.
IMC Section 109.2 is amended as follows:
109.2 Fees. The fees for mechanical permits shall be established by resolution. |
E.
IMC Section 109.2 is amended by adding a new subsection 109.2.1 as follows:
109.2.1 Fee Refunds. The code official shall authorize fee refunds as established by resolution. |
(Ord. 224 (1998) § 5.1, 1998; Ord. 323 (2004) § 68, 2004; Ord. 391 (2007) § 19, 2007; Ord. 440 (2009) § 17, 2009; Ord. 638 (2025) § 9, 2025)