"Agency"means the entities delegated the authority to implement and enforce this chapter by city.
"Applicant"means any individual, partnership, co-partnership, firm, company, corporation, association, joint stock company, trust, estate, governmental entity, or any other legal entity, or their legal representatives, agents, or assigns, who is responsible under this chapter for filing the application, paying the fees, reporting to the agency or enforcement officer, scheduling inspections, filing as-built drawings and requesting the stormwater certification of completion. It can mean the owner, developer, responsible engineer and contractors or subcontractors who must comply with the illicit discharge detection and elimination ordinance, erosion and sediment control plan or a stormwater pollution prevention plan until issuance of the stormwater system certificate of completion. Following issuance of the stormwater certification of completion, maintenance of the stormwater system will be the duty of the "responsible party" as defined in this section.
"Best management practices" or "BMPs"means schedules of activities, prohibitions of practices, maintenance procedures, and structural or managerial practices to prevent or reduce the discharge of pollutants directly or indirectly to stormwater, receiving waters, or stormwater conveyance systems. BMPs also include treatment practices, operating procedures, and practices to control site runoff, spillage or leaks, sludge or water disposal, or drainage from raw materials storage.
"Bioretention treatment facilities"are vegetated treatment systems (typically grass) that remove pollutants by means of sedimentation, filtration, soil sorption, and/or plant uptake. They are typically configured as swales or filter strips. These facilities are designed to remove low concentrations and quantities of total suspended solids (TSS), heavy metals, petroleum hydrocarbons, and/or nutrients from stormwater.
"Certified erosion and sediment control lead"or "CESCL" is the employee designated as the responsible representative in charge of erosion and spill control. The CESCL shall be qualified in construction site erosion and sediment control regulatory requirements and BMPs, and shall have thorough knowledge and understanding of the construction stormwater pollution prevention plan (SWPPP) for the project site.
"Channel" or "waterway"means an open conduit, either naturally or artificially created, which periodically or continuously contains moving water, or which forms a connecting link between two bodies of water.
"Common plan of development"means a site where multiple separate and distinct construction activities may be taking place at different times on different schedules, but still under a single plan. Examples include: phased projects and projects with multiple filings or lots, even if the separate phases or filings/lots will be constructed under separate contract or by separate owners (e.g., a development where lots are sold to separate builders); a development plan that may be phased over multiple years, but is still under a consistent plan for long-term development; and projects in a contiguous area that may be unrelated but still under the same contract, such as construction of a building extension and a new parking lot at the same facility. If the project is part of a common plan of development or sale, the disturbed area of the entire plan shall be used in determining permit requirements.
"Construction site or project site access/egress"is designated construction/project site entrances wherever traffic will be entering and leaving a construction/project site and traveling on paved roads or other paved areas within 1,000 feet of the site.
"Detention"means the release of stormwater runoff from the site at a slower rate than it is collected by the stormwater facility system, the difference being held in temporary storage with the goals of controlling peak discharge rates and providing gravity settling of pollutants.
"Development"means new development, redevelopment, or both. See definitions in this section.
"Downstream analysis"means an engineering analysis to identify any negative impacts post-project runoff on properties and drainage systems downstream of a development site, and identification of measures that will be implemented to mitigate or prevent identified impacts.
"Drainage control"means the management of drainage water. Drainage control is accomplished through the collection, conveyance, and discharge of drainage water, controlling the rate of discharge from a site, or separating, treating or preventing the introduction of pollutants.
"Drainage facility"means any facility, including best management practices, installed or constructed for the purpose of controlling the flow, quantity, and/or quality of drainage water. Drainage control facilities include, but are not limited to, all types of catch basins, pipes, detention/retention ponds, bioswales, and other structural and nonstructural components that handle surface water.
"Drainage system"means a system to collect, convey and control release of only drainage water. The system may serve public or private property. It includes constructed and/or natural components such as ditches, culverts, streams and drainage control facilities.
"Drainage water"means stormwater, snow melt, surface water, surface and irrigation runoff, water from footing drains and other city-approved drains or installed in compliance with this title and rules which may be adopted hereunder. Other water which is not an illicit discharge as defined in the city code shall be considered drainage water if it drains from the exterior of a building or structure, a pervious or impervious surface, or undeveloped land, or by surface or shallow subsurface flow.
"Ecology"means the Washington State Department of Ecology.
"Enforcement officer"means the person or persons designated or appointed by the city or agency that is authorized to administer and enforce this chapter, and their designees. The enforcement officer will meet CESCL qualifications.
"Erosion"means the wearing away of the ground surface as a result of mass wasting or the movement of wind, water and/or ice.
"Erosion and sediment control"means any temporary or permanent measures taken to reduce erosion, control siltation and sedimentation, and ensure that sediment-laden water does not leave the project site.
"Erosion and sediment control BMPs"means BMPs that are intended to prevent erosion and sedimentation, such as preserving natural vegetation, seeding, mulching and matting, plastic covering, filter fences, sediment traps, and ponds. Erosion and sediment control BMPs are synonymous with stabilization and structural BMPs.
"Erosion and sediment control plan" or "ESC plan"means a set of plans indicating the specific measures and sequencing to be used to control sediment and erosion on a project site during and after project activities. The ESC plan shall be implemented beginning with initial soil disturbance and continue until final stabilization. Each ESC plan shall bear the name(s) and address(es) of the owner or developer of the site, and of any consulting firm retained together with the name of the principal contact at such firm and shall be accompanied by a filing fee.
"Grading"means any excavation, filling, or combination thereof, modification of land contours and/or modification of waterways or drainage areas. The physical manipulation of the earth's surface and/or drainage patterns in preparation for an intended development or redevelopment. Grading may be subject to stormwater regulation whether or not development or redevelopment is planned at the project site where grading is conducted.
"Hearing officer"means the official appointed by the city for administrative hearings.
"Illicit discharge"means any direct or indirect nonstormwater discharge to the stormwater drainage system, except as permitted or exempted in Chapter
14.20 CMC, Illicit Discharge Detection and Elimination.
"Impaired waters"means those streams, rivers and lakes that currently do not meet their designated use classification and associated water quality standards under the Clean Water Act and listed on the most current state of Washington 303(d) list.
"Impervious surface"is a relatively hard surface area which either prevents or slows down the entry of water into the soil as under natural conditions prior to development. It is a hard surface area which causes water to run off the surface in greater quantities or at an increased rate of flow different than the natural conditions prior to development. Common impervious surfaces include, but are not limited to, rooftops, walkways, patios, driveways, paved parking lots or storage areas, concrete or asphalt paving, gravel roads, packed earthen materials, and oiled surfaces which similarly hinder the natural infiltration of stormwater.
"Inspector"means person designated by city or agency, inspection agency, or licensed civil engineer performing inspections mandated by this chapter. An inspector will meet same training and certification requirements as an enforcement officer.
"Land development" or "development"means the division of land into lots or parcels in accordance with Chapter
17.80 CMC and any clearing, excavation, dredging, drilling, filling, dumping, removal of earth and mineral materials, or other permanent or temporary modification of a project or construction site. For the purpose of this chapter, "development" also means any manmade change to improved or unimproved real estate located within the special flood hazard area, including but not limited to buildings or other structures, mining, dredging, filling, grading, paving, excavation, drilling, temporary or permanent storage of equipment and works defined in this chapter.
"Land-disturbing activity"means any activity that results in movement of earth, or a change in the existing soil cover (both vegetative and nonvegetative) and/or the existing soil topography. Land-disturbing activities include, but are not limited to, clearing, grading, filling, stockpiling materials and excavation. Compaction associated with stabilization of structures and road construction shall also be considered a land-disturbing activity. Vegetation maintenance practices are not considered land-disturbing activity.
"Large projects"are land development or redevelopment projects that disturbs one acre or more, or projects of less than one acre that are part of a common plan of development or sale, with ground-disturbing activities resulting from clearing, grading, excavating, or stockpiling of fill material, including the cumulative acreage of the entire project whether in a single or in a multiphase project. A local stormwater permit is required for large projects. Additionally, large projects must also determine whether they are subject to the requirements of Ecology's stormwater construction permit.
"Local stormwater permit"is a permit issued at the local level for medium and large projects and for projects that have additional environmental conditions described in CMC 14.21.050(3).
"Medium projects"are land development or redevelopment projects that disturb 5,000 square feet or more but less than one acre through clearing, grading, excavating, or stockpiling of fill material, including the cumulative acreage of the entire project whether in a single or in a multiphase project and/or has the potential to change natural drainage patterns. A local stormwater permit is required. If the project has the potential to directly affect impaired waters the agency has the discretion to require a stormwater pollution protection plan (SWPPP). Post-construction stormwater management tracking is waived.
"Municipal separate storm sewer system (MS4)" or "stormwater drainage system"includes, but is not limited to, the system of conveyances including sidewalks, roads with drainage systems, municipal streets, catch basins, curbs, street gutters, ditches, dry wells, retention and detention ponds, manmade channels, or storm drains owned and operated by the city.
"New development"means any of the following activities: structural development, including construction of a new building or other structure; expansion or alteration of an existing structure that results in an increase in the footprint of the building or structure; land-disturbing activities; creation or expansion of impervious surface; demolition; subdivision and short subdivision of land as defined in Chapter
17.80 CMC; and Class IV general forest practices, as defined in WAC
222-16-050, that are conversions from timberland to other uses. No other forest practices or commercial agriculture are considered new development.
"NPDES construction stormwater general permit"means the statewide general permit for construction activities administered by the Department of Ecology. All projects disturbing one acre or more of ground and having the potential to discharge directly or indirectly to waters of the state must seek coverage under the permit or meet erosivity waiver criteria.
"Point source"means any discernible, confined, and discrete conveyance, including but not limited to any pipe, ditch, channel, tunnel, conduit, well, discrete fissure, and container from which pollutants are or may be discharged to surface waters of the state. This term does not include return flows from irrigated agriculture.
"Pollutant" or "pollution"shall be construed to mean such contamination or other alteration of the physical, chemical, or biological properties of any of the waters of the state including change in temperature, taste, color, turbidity, or odor of the waters or such discharge of any liquid, gaseous, solid, radioactive, or other substance into any waters of the state as will or is likely to create a nuisance or render such waters harmful, detrimental, or injurious to the public health, safety, or welfare, or to domestic, commercial, industrial, agricultural, recreational, or other legitimate beneficial uses, or to livestock, wild animals, birds, fish, or other aquatic life; as defined in RCW
90.48.020 as now existing or hereafter amended.
"Project site"means any lot, parcel of land, street or highway right-of-way, or contiguous combination thereof, where new development, redevelopment, land-disturbing activity, or grading work is proposed or performed.
"Receiving water"means bodies of water or surface water systems to which surface runoff is discharged via a point source of stormwater or via sheet flow.
"Redevelopment"means a site that is already substantially developed, the replacement or improvement of impervious surfaces, including buildings and other structures, and replacement or improvement of impervious parking and road surfaces that is not part of a routine maintenance activity. Any new impervious surfaces, or any increase to existing impervious surface created by a redevelopment project, are subject to the requirements for new development.
"Responsible party"means any individual, partnership, co-partnership, firm, company, corporation, association, joint stock company, trust, estate, governmental entity, or any other legal entity, or their legal representatives, agents, or assigns, that is named on a stormwater maintenance agreement as responsible for long-term operation and maintenance of one or more stormwater BMPs.
"Retention"is the process of collecting and holding surface and stormwater runoff with no release or outflow.
"Retention/detention facility"is a type of drainage facility designed either to hold water for a considerable length of time and then release it by evaporation, plant transpiration, and/or infiltration into the ground; or to hold surface and stormwater runoff for a short period of time and then release it to the surface and stormwater management system.
"Rough grade"means a stage where grade conforms approximately to an approved plan.
"Sheet erosion"means the removal of a layer of exposed soil by the action of raindrop splash and runoff, as water moves in broad sheets over the land and is not confined in small depressions.
"Small projects"is a development or redevelopment project where land-disturbing activities are less than 5,000 square feet and/or land-disturbing activity does not have the potential to disturb or change existing drainage patterns. A local stormwater permit is not required. Post-construction stormwater management tracking is waived.
"Source control BMP"means a structure or operation intended to prevent pollutants from coming into contact with stormwater through physical separation of areas or careful management of activities that are sources of pollutants. Source control BMPs are separated into two types. Structural source control BMPs are physical, structural, or mechanical devices or facilities that are intended to prevent pollutants from entering stormwater. Operational BMPs are nonstructural practices that prevent or reduce pollutants from entering stormwater.
"Stabilization"means the use of practices that prevent exposed soil from eroding.
"Start of project/construction"means the first land-disturbing activity associated with a development, including land preparation such as clearing, grading, and filling; installation of streets and walkways; excavation for basements, footings, piers, or foundations; erection of temporary forms; and installation of accessory buildings such as garages.
"Stop work order"means an order issued that requires that all activity violating this chapter or a permit granted under this chapter on a project/construction site be stopped.
"Stormwater"means that portion of precipitation that does not naturally percolate into the ground or evaporates, but flows via overland flow, interflow, pipes and other features of a stormwater drainage system into a defined surface water body, or a constructed infiltration facility.
"Stormwater management"means the use of structural or nonstructural practices that are designed to reduce stormwater runoff pollutant loads, discharge volumes, peak flow discharge rates and detrimental changes in stream temperature that affect water quality and habitat.
"Stormwater pollution prevention plan" or "SWPPP" or "construction SWPPP"means a set of plans prepared indicating the specific measures and sequencing to be used to control sediment and erosion on a development site during and after construction. Plans and specifications that involve structures, equipment, or processes required to collect, carry away, treat, reclaim or dispose of industrial wastewater, including contaminated stormwater, must be prepared under the supervision of a licensed professional engineer (PE).
"Stormwater site plan"or "SSP" is a comprehensive report containing all of the technical information and analysis necessary for regulatory agencies to evaluate a proposed new development or redevelopment project for compliance with stormwater requirements. Contents of the SSP will vary with the type and size of the project, individual site characteristics, and special requirements of the agency.
"Stream"means an area where surface waters flow sufficiently to produce a defined channel or bed. A defined channel or bed is an area that demonstrates clear evidence of the passage of water including, but not limited to, hydraulically sorted sediments, or the removal of vegetative litter or loosely rooted vegetation by the action of moving water. The channel or bed need not contain water year-round. This definition is not meant to include irrigation ditches, canals, stormwater runoff devices or other entirely artificial watercourses, unless they are used to convey streams naturally occurring prior to construction. Those topographic features that resemble streams but have no defined channels (i.e., swales) shall be considered streams when hydrologic and hydraulic analyses done pursuant to a development proposal predict formation of a defined channel after development.
"Structure"means anything constructed or erected which requires location on the ground or attached to something having a location on the ground.
"Surface waters"includes lakes, rivers, ponds, streams, inland waters, salt waters, wetlands, other surface waters, and watercourses as well as shallow ground water.
"UIC device"means a system used to inject stormwater into the subsurface, including dry wells and infiltration trenches.
"Underground injection control program" or "UIC program"means the Federal Safe Drinking Water Act program to protect existing and future underground sources of drinking water from contamination by injection of waste fluids, such as stormwater, into the ground. The UIC program is administered under Chapter
173-218 WAC by the Washington State Department of Ecology.
"Watercourse" and "river or stream"mean any portion of a channel, bed, bank, or bottom below the ordinary high water line of waters of the state including areas in which fish may spawn, reside, or through which they may pass, and tributary waters with defined bed or banks, which influence the quality of fish habitat downstream. This includes watercourses which flow on an intermittent basis or which fluctuate in level during the year and applies to the entire bed of such watercourse whether or not the water is at peak level. This definition does not include irrigation ditches, canals, stormwater run-off devices, or other entirely artificial watercourses, except where they exist in a natural watercourse which has been altered by humans.
"Waters of the state"means all lakes, rivers, ponds, streams, inland waters, underground waters, salt waters, and all other surface waters and watercourses within the jurisdiction of the state of Washington as defined in Chapter
90.48 RCW.
"Wetlands"are areas characterized by saturated or nearly saturated soils most of the year that form an interface between terrestrial (land-based) and aquatic environments. Wetlands include marshes around lakes or ponds and along river or stream channels.
(Ord. 1466 § 1, 2010)