(1)
It is unlawful for any person, firm or corporation to dig up, break, excavate, use, occupy, tunnel, undermine, obstruct, construct or disturb any public street, alley, sidewalk, highway, thoroughfare, other public place or public easement, or fill in, place, leave or deposit in or upon any such public street, alley, sidewalk, highway, thoroughfare, other public place or public easement any article, material or thing whatsoever tending to obstruct, or disturb, without first having obtained a construction permit therefor. In the event it is necessary to dig, excavate, tunnel, undermine or in any manner enter the street right-of-way in making a sewer hookup, a construction permit will be required under this chapter, and such work can only be done by a bonded contractor.
(2)
Failure to obtain a construction permit prior to commencing work shall be deemed a violation of this chapter, and shall be cause for the DPW to issue a stop-work order until an application for the permit has been received and a permit issued. A 50 percent penalty may be added to the cost of such late permit.
(Ord. 649 Ch. V § 1, 1967)