(1)
A building permit is required to construct, alter, and/or modify fencing in the city of Clarkston, as outlined in Chapter 15.40 CMC.
(2)
Fencing shall be constructed on private property not on public right-of-way. It shall be the property owner's responsibility and obligation to identify the property lines when proposing to construct fencing. A property survey may be required by the city.
(3)
Fencing shall not conflict with the requirements for clear-vision area as outlined in CMC 17.15.020.
(4)
To obtain a fencing permit the applicant shall provide a site map of the property, indicating the location of the fence, the height, the material (type) of fencing, a north arrow, and the city street. No permit will be issued without a site map.
(5)
Fencing shall be maintained in good working order; property owners are responsible for maintaining fencing.
(6)
No pallets, construction demo, and/or unapproved fencing shall be constructed and/or maintained in the city.
(Ord. 1630 § 1, 2019)