A.
Engineering plan review and approval shall be required for: (1) work in, on, over, under, or affecting the public right-of-way; (2) frontage improvements required as a condition of development approval or right-of-way use; and (3) work on private property when facilities are constructed to city standards, connected to city systems, or dedicated to the City.
B.
Plans shall be prepared, signed, dated, and stamped by a licensed professional engineer. The City Engineer may waive the engineered-plan requirement for minor work when the scope and risk do not warrant engineered plans. Any waiver shall be in writing and may include conditions set by the City.
C.
Plans shall be designed according to the Design and Development Standards in effect at the time of plan approval, unless otherwise approved in writing by the City Engineer.
D.
Plans and supporting documents shall be submitted to the Engineering Department in the formats and with the content specified in the Design and Development Standards. The City Engineer may require detailed project specifications where general notes are insufficient and may require any supporting reports and analyses necessary to demonstrate compliance, including, but not limited to, stormwater, geotechnical, transportation/traffic, water, sewer, illumination, and signal analyses. Any necessary easements or dedications shall be submitted for review along with the plans.
E.
A temporary traffic control plan shall be submitted for work in the right-of-way. The City Engineer may require a temporary traffic control plan for work outside of the right-of-way if the proposed work will affect public travel.
(Ord. 2573, 1/13/2026)