A.
Based on the provisions of this Master Program, the Director shall determine if a substantial development permit, a shoreline conditional use permit and/or a shoreline variance is required.
B.
A permit is required for substantial development as defined in SMC § 20.210.010 and RCW 90.58.030(3)(e), as amended from time to time, within the shoreline jurisdiction.
C.
A substantial development permit is not required for exempt development. An exempt development requires a statement of exemption pursuant to SMC § 20.220.030 and may require a shore-line variance from Master Program provisions and/or a shoreline conditional use permit.
D.
All uses and development shall be carried out in a manner consistent with the SMC and the Master Program regardless of whether a substantial development permit, statement of exemption, shoreline variance, or shoreline conditional use permit is required.
E.
When a development or use is proposed that does not comply with the bulk, dimensional and/or performance standards of this program, such development or use may only be authorized by approval of a shoreline variance, even if the development or use does not require a substantial development permit.
F.
A development or use listed as a shoreline conditional use pursuant to this chapter, or any unlisted use, must obtain a shoreline conditional use permit even if the development or use does not require a substantial development permit.
G.
Issuance of a statement of exemption, shoreline substantial development permit, shoreline variance, or shoreline conditional use permit does not constitute approval of any other City, State, or federal laws or regulations.
H.
All shoreline permits or statements of exemption issued for development or use within the shoreline jurisdiction shall include written findings prepared by the Director, documenting compliance with bulk and dimensional policies and regulations of this Master Program. The Director may attach conditions to the approval as necessary to assure consistency with the SMA and this Master Program. The conditions may include a requirement to post a performance financial guarantee assuring compliance with permit requirements, terms and conditions.
(Ord. 668 § 4 (Exh. 3), 2013; Ord. 856 § 2 (Exh. A), 2019)