Prior to the issuance of a street use permit for the construction of any improvements in a city right-of-way, design drawings of the improvements shall be submitted to the city for review and approval. The cost of reviewing and processing the design drawings, as required by FMC 3.80.010(B), and/or actual cost of consulting engineer fees, if required by the city engineer, shall be paid prior to issuing the associated street use permit. All inspection costs incurred with the street use activity including hourly wage of the inspector plus benefits and administrative overhead shall be paid prior to acceptance of the improvements by the city and release of any associated performance bonds. Plan review and inspection fees shall not be applicable to repair work but shall apply only to new construction.
(Ord. 1366 § 2, 1999; Ord. 1416 § 2, 2000; Ord. 1859 § 22, 2014)