The provisions of this title apply to the processing of both final short and long plats and unit lot subdivisions (ULS). A final plat/ULS can only be applied for after a preliminary plat/ULS approval has been issued, and the conditions and improvements required by the preliminary plat approval have been installed or adequately provided for.
(Ord. 2043 § 1 (Att. E), 2021; Ord. 2140 § 2 (Exh. B), 2025)