[R.O. 2012 §404.080; Ord. No. 88-5-5, 5-16-1988]
Any building or structure for which a building permit has been issued by the City of Excelsior Springs may be constructed according to the terms of said permit. In addition, during a period of ninety (90) days following the adoption of this ordinance a permit may be issued for any building or structure for which plans were substantially complete on the date of the adoption of this ordinance provided the Building Official, in his/her judgment, is convinced that the plans were indeed prepared in good faith and that substantial and undue hardship would prevail if the construction were not allowed to proceed. Such building, structure or site conditions may not conform in all respects with this Chapter but shall conform to the previous zoning ordinances and the codes of the City of Excelsior Springs. This period of transition may terminate ninety (90) days following the date of the adoption of this ordinance and thereafter all permits for construction shall require full conformance with this Chapter. In all cases of such non-compliance during this period of transition, construction shall begin within one hundred (100) days of the adoption of this ordinance or full compliance herewith shall be required.