(a)
Permit Fee Valuation And Multiplier. The IBC Permit Fee Schedule as published by the International Code Council in the Building Valuation Data publication shall be used to determine valuation for new construction. The permit fee shall be calculated using Gross Area x Gross Area Modifier x Permit Fee Multiplier (0.0033) = Permit Fee. The permit fee multiplier shall be increased by 0.0001 annually along with a valuation update with data from the most recently published IBC Permit fee schedule as of January 1 of each year, until a minimum fifty percent (50%) recapture rate is maintained by the Community Development Department and Fire Department in costs related to building inspections and property maintenance.
Flat Rate Fee Schedule | ||
|---|---|---|
Portable storage building over 200 sq. ft. | $100.00 | |
Tent | $100.00 | |
Portable carport | $100.00 | |
Deck, porch or stairs | $100.00 (residential) | $200.00 (commercial) |
Electric service | $75.00 (residential) | $200.00 (commercial) |
Mechanical, electric, plumbing work | $75.00 (residential) | $200.00 (commercial) |
Pool or spa (residential) | $100.00 (above-ground) | $250.00 (in-ground) |
Pool or spa (commercial) | $500.00 | |
Mobile home | $225.00 | |
Alterations less than 500 sq. ft. | $100.00 (residential) | $200.00 (commercial) |
Alterations 501 – 1,499 sq. ft. | $175.00 (residential) | $350.00 (commercial) |
Alterations 1,500 sq. ft. and larger | $325.00 (residential) | $650.00 (commercial) |
Signs 50 sq. ft. and under | $150.00 | |
Signs over 50 sq. ft. | $300.00 | |
Fire sprinklers | $600.00 | |
Parking lot | $250.00 | |
Communication tower | $1,000.00 | |
Demolition | $100.00 (residential) (plus $200.00 deposit) | $200.00 (commercial)(plus $500.00 deposit) |
Excavation | $25.00 (plus $725.00 deposit) | |
(c)
Work Without A Permit. When construction has commenced without a permit, the permit fee shall be twice the original amount to cover any additional inspections and time necessary to ensure compliance with the code.
(d)
Failure To Obtain Required Inspection. When construction has begun under the authorization of a permit, but the permit holder has failed to obtain the required inspection, and the construction has passed the stage in which the inspection can be reasonably done, then an additional twenty-five percent (25%) of the original permit fee [twenty-five dollars ($25.00) minimum] will be charged.
(e)
Failure To Obtain Final Inspection Prior To Permit Expiration. A twenty-five dollar ($25.00) fee will be assessed for a one-time final inspection. If more inspections are required, the permit shall be renewed for fifty percent (50%) of the original permit fee.
(f)
Deposits Required. A two hundred dollar ($200.00) deposit will be required on all residential permits and a five hundred dollar ($500.00) deposit will be required on all commercial construction permits with estimated construction costs greater than two thousand five hundred dollars ($2,500.00). This deposit shall be refunded after final inspection has been approved under a valid and current permit and the Public Works Department has approved all work and the condition of the right-of-way. Should the permit expire or final inspection not be obtained and approved before permit expiration, the deposit shall be forfeited.
(g)
Reinspection Fee. A fee of fifty dollars ($50.00) will be assessed for return inspections after the initial inspection and one (1) additional inspection.
(h)
Where no work has commenced on an issued permit, a refund may be processed, upon written request of same. Twenty percent (20%) of the building permit fee will be retained to cover administrative and plan review expenses.