In cases of new construction or property development where utilities are to be placed underground, the developer or property owner shall give the grantee at least 30 days' advance notice of the particular date on which utilities are to be placed underground in conjunction with such construction or property development. The grantee shall promptly thereafter provide the developer or property owner with specifications as needed for trenching, installation of conduit, vaults, pedestals, cable, and related components, and for the pre-wiring of the units being constructed.
(1) Installation. The developer or property owner will, at its own cost and expense:
(a) Perform all necessary trenching and backfilling for underground distribution and service laterals required for the extension of the underground distribution system of any cable communications system authorized to provide service in such area;
(b) Provide for the installation of all conduit, vaults, and pedestals required for the distribution and transmission lines of the cable system to be located in such distribution and service laterals (with the grantee to place the cable therein and attach all required electronic components thereto); and
(c) Provide for the pre-wiring of each residential dwelling unit located in such which are to be installed by the developer or property owner under the provisions of this section shall be borne by the developer or property owner. The cost of the cable and associated electronics required for such underground distribution system or for such pre-wiring shall be borne by the grantee.
(Prior code § 19-38; Ord. 619-88, 11-8-1988)