Unless waived in writing by the city engineer, a soils report shall be prepared for all subdivisions.
The soils report shall be prepared by a registered civil engineer, shall be based upon a sufficient number of test borings to define the soils at the site, and shall contain definitive information regarding soil types, expansive characteristics, estimated load bearing capacity, and any other characteristics of the soil which would affect its ability to support structures.
(Res. 11-79 § III(A), 7-24-1979)
The subdivider shall provide compaction testing of all land fills within building setback lines which have a depth of one foot or more above original grade. Testing shall be performed by, or under the direction of, a registered civil engineer. Testing shall be performed by AASHO Test Method T-99 or alternate method approved by the city engineer, and a sufficient number of tests shall be performed to ensure that uniform compaction is being obtained.
(Res. 11-79 § III(B), 7-24-1979)
The subdivider shall provide additional tests and/or reports which are requested by the city manager to adequately define unique or unusual conditions in the subdivision.
(Res. 11-79 § III(C), 7-24-1979)