Closure Criteria, Permit Requirements. Any unpermitted connections to the state highway system which were in existence on July 1, 1990, shall not require the issuance of a permit and may continue to provide connection to the state highway system, unless the property owner had received written notification initiating connection closure from the city prior to July 1, 1990, or unless the city determines that the unpermitted connection does not meet minimum acceptable standards of highway safety. The city may require that a permit be obtained if a significant change occurs in the use, design, or traffic flow of the connection or of the state highway to which it provides access. If a permit is not obtained, the city may initiate action to close the unpermitted connection point pursuant to RCW
47.50.040. Any unpermitted connection opened subsequent to July 1, 1990, is subject to closure by the city. The process to be followed by the city in the closure of an unpermitted connection shall be consistent with RCW Chapter
34.05 and rules adopted thereunder. The notification process is as follows:
(1) Notification. The city shall serve notice, in accordance with rules adopted pursuant to RCW Chapter
34.05, upon the property owner of a connection to a state highway which is found by the city to be unpermitted. This notice shall clearly describe the highway connection violation and shall establish a thirty day time limit for either applying for a connection permit or requesting an adjudicative proceeding pursuant to RCW Chapter
34.05. The sole issue to be determined at the adjudicative proceeding is whether a permit should be required. The notice will further advise the property owner that failure to act in either of the prescribed ways within the time period will result in city closure of the unpermitted connection.
(2) Permit Application. If a permit application is filed within the thirty days, and the application is denied, the city shall notify the property owner of the denial. The property owner may then proceed with the permit application revision process set forth in this chapter or request an adjudicative proceeding pursuant to this chapter within thirty days. Failure to act in either of those prescribed ways within the time period set forth in the rules will result in city closure of the unpermitted connection. If the location and design of the connection in the permit application are acceptable to the city, the existing connection may continue to be used for a specified period of time or until the connection specified in the permit application is constructed.
(3) Approval Conditions. Modifications, relocation, or closure of unpermitted connections may be required by the city as a requirement of permit approval, subject to the adjudicative proceedings provisions of this chapter.
(Ord. 1234 § 14, 1993)