All significant users proposing to connect to or to contribute to the POTW shall obtain a wastewater contribution permit before connecting to or contributing to the POTW. Users required to obtain a wastewater contribution permit shall complete and file with the City an application in the form prescribed by the City, and accompanied by the applicable fee. Existing users shall apply for a wastewater contribution permit within sixty (60) days after the effective date of the ordinance codified in this Chapter, and proposed new users shall apply at least ninety (90) days prior to connecting to or contributing to the POTW. In support of the application, the user shall submit, in units and terms appropriate for evaluation, the following information:
(A)
Name, address, and location (if different from the address).
(B)
SIC number according to the Standard Industrial Classification Manual, Bureau of the Budget, 1972, as amended.
(C)
Wastewater constituents and characteristics including but not limited to those mentioned in Article 3 of this Chapter as determined by a reliable analytical laboratory; sampling and analysis shall be performed in accordance with procedures established by the EPA.
(D)
Average daily wastewater flow rates including daily, monthly, and seasonal variations, if any.
(E)
Site plans showing all building sewers and appurtenances (manholes, distribution boxes, etc.).
(F)
A brief description of activities, facilities and plant processes on the premises including all materials that are or could be involved in discharges to the sewer.
The City will evaluate the data furnished by the user and may require additional information. After evaluation and acceptance of the data furnished, the City may issue a wastewater contribution permit subject to terms and conditions provided herein.