(1)
Time of Filing.
(a)
A final plat meeting all the requirements of Chapter 58.17 RCW and of this chapter, shall be filed with the town engineer within three years of the date of preliminary plat approval. As required by RCW 58.17.140, an applicant who files a written request with the town council at least 30 days before the expiration of the three-year period shall be granted a one-year extension upon a showing that the applicant has attempted in good faith to submit the final plat within the three-year period.
(b)
Within 30 days of the date of filing of the plat, unless the applicant consents to an extension of the time period, final plats shall be approved or disapproved by action of the town council, or returned to the applicant.
(2)
Submittal Requirements. The following shall be submitted for final plat review:
(a)
A final plat consistent with the technical requirements of CMC § 17.08.066 and Articles V and VI;
(b)
A complete survey of the section or sections in which the plat or replat is located, or as many sections as may be necessary to properly orient the plat within the section or sections;
(d)
A title report from a title company licensed to do business in the state showing the ownership and title of all parties of interest in the subdivision and confirming that title of the lands as described and shown on the final plat is in the name of the owners signing the certificate required in CMC § 17.08.068.
(e)
A guarantee deposit in an amount established by the town engineer sufficient to cover the expense of the town in checking the plat, advertising the ordinance, posting notices.
(Ord. 428 § 16.08.064, 1998)