All roads shall be designed and constructed in accordance with the current edition of the American Association of State Highway and Transportation Officials “Geometric Design of Highways and Streets” and the city of Mill Creek “Design and Construction Standard Plans” in effect on the date a notice of complete application is issued for a complete development application.
The current edition of the Federal Highway Administration “Manual on Uniform Traffic Control Devices” shall be used as the design and operational regulatory guideline for all traffic control devices on public roads.
LID best management practices, such as permeable paving and bioretention facilities, are required when site and soil conditions make LID feasible. Permeable pavement is applicable to low traffic volume surfaces. LID facilities shall be designed and constructed in accordance with the LID Technical Guidance Manual for Puget Sound (current edition) and the city of Mill Creek “Design and Construction Standard Plans” and the 2019 Storm-water Management Manual for Western Washington.
(Ord. 2005-609 § 2; Ord. 2009-702 § 2 (Exh. C); Ord. 2015-803 § 3 (Exh. A); Ord. 2017-814 § 2; 2021-881 § 2 (Exh. A(6)))