Type
|
Debt
(points)
| ||
---|---|---|---|
Vacant lot (per acre)
|
7
| ||
Single-family dwelling
|
10
| ||
Two-family dwelling
|
20
| ||
Apartment building (each individual apartment)
|
10
| ||
Condominium (each individual condominium unit)
|
11
| ||
Mobile homes
|
10
| ||
Motels
| |||
First unit and office
|
20
| ||
Other units
| |||
(a)
|
Sleeping units
|
5
| |
(b)
|
Efficiency units
|
7
| |
Neighborhood commercial (office and small store,
includes commercial/residential buildings, business on premises)
| |||
(a)
|
Per building
|
20
| |
(b)
|
Toilets, beyond 2
|
25
| |
(c)
|
Sinks, beyond 2
|
15
| |
(d)
|
Drains (each)
|
20
| |
Office/light industry - design shopping
| |||
Primary building
|
40
| ||
(a)
|
Toilets, beyond 2
|
25
| |
(b)
|
Sinks, beyond 2
|
15
| |
(c)
|
Drains (each)
|
20
| |
Manufacturing and processing (CLS 700)
| |||
Primary building
|
60
| ||
(a)
|
Toilets, beyond 6
|
25
| |
(b)
|
Sinks, beyond 2
|
15
| |
(c)
|
Drains (each)
|
20
| |
Laundromats/car wash
|
20
| ||
Extra points to be based on previous year's
water consumption record, each 12,000 cubic feet
|
1
| ||
Institutions
| |||
Schools (each 100 pupils)
|
20
| ||
Churches [each 100 members (or fraction)]
|
10
| ||
Membership [100 members (or fraction)]
|
10
| ||
Industries shall be assessed for debt service
on the following basis:
| |||
(a)
|
Transportation system (sewers, pump stations
and force mains): the parameter for determination of the depth charge
is the design discharge from an industry as a percentage of the design
flow in the sewer. The industry's allocation will be based on the
cost of the portion of the sewer downstream from the industrial discharge.
| ||
(b)
|
Treatment system: the debt service charge for
an industrial user of the sewage treatment system shall be computed
by utilizing the same formula as is used for computing the annual
user charge, except that the base charges will be developed from the
yearly debt bond payments for construction of sewage treatment facilities
instead of annual operation and maintenance costs
| ||
Airports
|
500
| ||
Undeveloped acreage (each acre)
|
7
| ||
Subdivided lots, approved [if in excess of 15,000
square feet (100 base by 150 feet), debt shall be charged on basis
of undeveloped acreage]
|
7
|