A.
Initial permits required.
(1)
All applications for a certificate of registration shall be made by the landowner or his authorized representative in accordance with the Rules and Regulations, Commonwealth of Pennsylvania, Department of Environmental Protection, Chapter 179, Regulations for Mobile Home Parks, Adopted September 18, 1971, as amended.
(2)
It shall be unlawful for any person to maintain, construct, alter, or extend any mobile home park within the limits of the Township, unless he holds a valid certificate of registration issued by the Pennsylvania Department of Environmental Protection in the name of such person and also a permit issued by the Township.
(3)
All mobile homes shall bear the Commonwealth of Pennsylvania's seal of approval.
B.
Application for initial mobile home park permit.
(1)
Application for development of a lot or parcel of land for mobile home park purposes shall be made and approved or approved as modified before any zoning permit for such use shall be issued.
(2)
Application for a mobile home park permit shall follow the requirements and procedures of a major subdivision plan submission as described in Article IV of this chapter.
(3)
In addition to the requirements contained in § 170-21 of this chapter, an application for preliminary or final approval of a mobile home park shall indicate by drawings, diagrams, maps, tests, affidavit or other legal instrument the following:
(a)
The location and number of mobile home lots and mobile home pads on a layout map of the parcel at a scale of one inch equals not more than 50 feet.
(b)
The location and dimension of all driveways, pedestrian ways, sidewalks, and access roads with notation as to type of impervious cover.
(c)
The location and dimension of all parking facilities.
(d)
The location, dimension, and arrangement of all areas to be denoted to lawns, buffer strips, screen planting, and recreation.
(e)
Location and dimension of all buildings existing or proposed to be built and all existing tree masses and trees of over twelve-inch caliper.
(f)
Proposed provisions for accommodating stormwater drainage, sewage treatment and disposal, street and on-site lighting, water supply, and electrical supply in the form of written and diagrammatic analysis with calculations and conclusions prepared by a registered professional engineer.
(g)
Three copies of the application submitted to and approved by the Department of Environmental Protection.
C.
Issuance of initial permit.
(1)
Upon receipt of the final plan with the recommendations of the Planning Commission attached thereto, the Township Supervisors shall review the final plan for compliance with the provisions of this chapter.
(2)
Upon approval of the final plan by the Board and payment of the required fees by the applicant, the Board of Supervisors shall issue a mobile home park permit to the owner which shall be valid for a period of one year thereafter.
(3)
Renewal permits shall be issued annually by the Board of Supervisors upon the furnishing of proof by the applicant that his park continues to meet the standards prescribed by the Pennsylvania Department of Environmental Protection and this chapter.
(4)
A building inspector or other Township officer may inspect a mobile home park at reasonable intervals and at reasonable times to determine compliance with this chapter.
(5)
The permit shall be conspicuously posted in the office or on the premises of the mobile home park at all times.
D.
Compliance of preexisting mobile home parks.
(1)
Mobile home parks in existence at the date of the adoption of this chapter and being duly authorized to operate as same by the Department of Environmental Protection may be continued so long as they otherwise remain lawful.
(2)
Preexisting mobile home parks shall be required to submit an existing lot plan, drawn to scale, when applying for a mobile home park permit as required under this chapter.
(3)
Any subsequent new construction, alteration or extension of a preexisting mobile home park shall comply with the provisions of this chapter.
(4)
Any preexisting mobile home park which in the opinion of the Board of Supervisors creates a fire, safety, or health hazard shall be required to comply with the applicable provisions of this chapter, within a reasonable period of time as determined by the same body.
E.
Individual mobile homes.
(1)
Individual mobile homes not located in a mobile home park shall not be required to obtain a mobile home park permit; however, they shall be required to obtain a building permit.
(2)
Individual mobile homes shall comply with all other applicable Township ordinances and regulations that govern single-family homes.