A.
Prior to the granting of final approval, the subdivider shall have installed or shall have furnished performance guaranties for the ultimate installation of the following, on site or on tract:
(1)
Streets.
(2)
Street signs.
(3)
Curbs and/or gutters.
(4)
Sidewalks.
(5)
Streetlighting.
(7)
Topsoil protection. No topsoil shall be removed from the site or used as spoil. Topsoil moved during the course of construction shall be redistributed so as to provide a minimum of six inches of uniform cover to all areas of the subdivision. The surface soil shall be stabilized by perennial grass or appropriate vegetation so as to remain in place and reduce erosion and consequent interference with drainage channels or outlets.
(8)
Monuments shall be of the size and shape required by N.J.S.A. 46:23-9.11 and shall be placed in accordance with that section. An escrow amount of $250 per monument shall be deposited with the Borough of Cresskill to assure proper placement. The bond shall be refunded after approval by the Borough Engineer.
[Amended 2-19-1985 by Ord. No. 85-4-894; 1-1-1989 by Ord. No. 88-26-1003]
(9)
Iron pipe of suitable size and extending to a depth of 36 inches shall be placed at all lot corners as markers, except where monuments are located. Such markers shall be placed after all rough grading has been completed and prior to any application to the Board of Health for permits to install individual sewage disposal systems.
(10)
Water mains, culverts, storm sewers and sanitary sewers. All such installation shall be properly connected with an approved system and shall be adequate to handle all present and probable future development.
(11)
In Sanitation Classes S-2 and S-3 cases, the Planning Board shall require sanitary sewer installations, in addition to individual sewage disposal units, for future connection with sewerage trunk lines in the Borough.
B.
All of the above-listed improvements shall be subject to inspection and approval by the Borough Engineer, who shall be notified by the subdivider at least 24 hours prior to the start of construction. No underground installation shall be covered until inspected and approved.