Subdivision plats, including related streets, drainage, parks and other improvements and the provision for water supply, sewage disposal and easements, shall be planned, designed and constructed in accordance with the standards hereinafter specified, including the following:
A.
Plans. Construction plans shall be prepared in accordance with good professional design practice. Such plans shall be approved in writing by the Planning Board and, at the discretion of the Board, may be required to be approved in writing by the Philipstown Superintendent of Highways or by an engineer or representative designated by the Town Board.
B.
Construction. The construction of improvements shall be carried out in a workmanlike manner, in accordance with the time limits approved by the Planning Board and in accordance with the accepted construction program. All construction shall be subject to inspection and notification as follows:
(1)
The Planning Board and the Town Superintendent of Highways or an engineer or representative designated by the Town Board shall have free access to the construction work at all times and shall be deemed authorized to take materials samples, cores and other tests as deemed necessary to determine compliance with the standards of these regulations.
(2)
The Planning Board, Superintendent of Highways or representative designated by the Town Board may require the applicant, at his expense, to have such tests made and certified by a land surveyor or professional engineer, or both, as required or permitted by law.
(3)
Other Town agencies and state and county agencies having regulatory jurisdiction over portions of the plat shall also have free access to the construction work at all times.
(4)
The applicant or his contractor or agent shall give timely notice to the Town Superintendent of Highways or engineer or representative designated by the Town Board at the commencement and completion of each phase of the work in accordance with procedures as may hereafter be adopted by the Town Board or Planning Board.