It shall be unlawful to alter or remove any
permanent stormwater control and BMP required by an approved stormwater
control and BMP operations and maintenance plan or to allow the property
to remain in a condition which does not conform to an approved stormwater
control and BMP operations and maintenance plan.
Persons installing stormwater controls or BMPs
shall be required to pay a specified amount to the Municipal Stormwater
Control and BMP Operation and Maintenance Fund to help defray costs
of periodic inspections and maintenance expenses. The amount of the
deposit shall be determined as follows:
A. If the stormwater control or BMP is to be privately
owned and maintained, the deposit shall cover the cost of periodic
inspections performed by the municipality for a period of 10 years,
as estimated by the Municipal Engineer. After that period of time,
inspections will be performed at the expense of the municipality.
B. If the stormwater control or BMP is to be owned and
maintained by the municipality, the deposit shall cover the estimated
costs for maintenance and inspections for 10 years. The Municipal
Engineer will establish the estimated costs utilizing information
submitted by the applicant.