In addition to any other requirements imposed as a
part of the site plan review process, the Planning Board shall require
postconstruction monitoring as a condition of approval of all systems
over 2,000 gallons per day capacity. The level of monitoring shall
be based upon proximity to existing residential developments, wells
for drinking water, aquifers, wetlands (including but not limited
to wooded wetlands), lakes, ponds, rivers and other water bodies.