A.
Immediately after backfilling the excavation, the permittee shall place thereon an acceptable temporary resurfacing as provided hereinbelow. Such temporary resurfacing shall be maintained even with the roadway or other surface, as directed, until permanent restoration of the surface is ordered by the Director.
B.
The temporary resurfacing shall consist of not less than two inches of macadam or approved equal thereto when opening is made in an existing concrete, asphaltic, bituminous or macadam pavement and not less than two inches of three-fourths-inch-diameter stone in all cases, except that where topsoil, seeded areas or sod has been disturbed by the excavation, the permittee shall restore the ground surface to the same condition as existed before the work was begun.
[Amended 1-28-1985]
C.
Permanent restoration of the surface over a street opening excavation shall not be made until satisfactory settlement of the backfill has taken place, in the opinion of the Director.