When requested by the Executive Director, all industrial users must
submit information on the nature and characteristics of their wastewater by
completing a wastewater survey prior to commencing their discharge. The Executive
Director is authorized to prepare a form for this purpose and may periodically
require industrial users to update the survey. Failure to complete this survey
shall be reasonable grounds for terminating service to the industrial user
and shall be considered a violation of this chapter.
Any significant industrial user which discharges industrial waste into the POTW prior to the effective date of this chapter and who wishes to continue such discharges in the future shall, within 30 days after the effective date of this chapter, apply to the PSA for a wastewater discharge permit in accordance with §
73-36 below and shall not cause or allow discharges to the POTW to continue after 30 days of the effective date of this chapter, except in accordance with a wastewater discharge permit issued by the Executive Director.
Any significant industrial user proposing to begin or recommence discharging
industrial wastes into the POTW must obtain a wastewater discharge permit
prior to the beginning or recommencing of such discharge. An application for
this wastewater discharge permit must be filed at least 30 days prior to the
date upon which any discharge will begin.
All wastewater discharge permit applications and industrial user reports
must contain the following certification statement and be signed by an authorized
representative of the industrial user:
|
"I certify under penalty of law that this document and all attachments
were prepared under my direction or supervision in accordance with a system
designed to assure that qualified personnel properly gather and evaluate the
information submitted. Based on my inquiry of the person or persons who manage
the system or those person directly responsible for gathering the information,
the information submitted is to the best of my knowledge and belief, true,
accurate and complete. I am aware that there are significant penalties for
submitting false information, including the possibility of fine and imprisonment
for knowing violations."
|
The Executive Director will evaluate the date furnished by the industrial
user and may require additional information. Within 10 days of receipt of
a complete wastewater discharge permit application, the Executive Director
will determine whether or not to issue a wastewater discharge permit. If no
determination is made within this time period, the application will be deemed
denied. The Executive Director may deny any application for a wastewater discharge
permit.