A.
No person shall construct, remove, replace or repair a sidewalk or driveway or lower a curb within the limits of any public street, highway or other public property without first obtaining therefor from the Commissioner a written permit as hereinafter provided.
B.
Such permit shall be valid for an effective period not to exceed 30 consecutive calendar days, to be determined and specified therein by the Commissioner. Such effective period may be extended, if so requested in writing by the permittee prior to expiration thereof, for such additional period as the Commissioner, at the latter's discretion, may authorize.