A.
The installation and repair of sewer, drainage and water service lines within the limits of any public street, highway, easement or other public property and the connection of such service lines to the sanitary sewers, stormwater drains and water mains of the City shall be done in accordance with the provisions of the rules and regulations of the Department of Public Works and shall also conform to such specifications as may be promulgated by the Commissioner.
B.
The tapping of water mains and the installation and repair of water service lines, in addition to such rules, regulations and specifications, shall also conform to the rules and regulations of the Board of Water Supply of the City of Mount Vernon.
C.
A sewer service line between its connection point at the sanitary sewer and existing building shall be of heavy cast-iron pipe with lead joints or such other approved types of joints as may be allowed by the Plumbing Code of the City of Mount Vernon and shall be laid by a licensed plumber.
D.
A drainage service line between its connection point at the stormwater drain and existing building shall be of heavy cast-iron pipe with lead or other approved joints.
E.
Such service lines shall be laid on a straight alignment and uniform gradient of not less than 1/4 inch per foot, unless otherwise specifically authorized by the Commissioner, and having all changes in direction made with approved fitting.