Any person desiring to construct a driveway
entrance onto a lot or parcel of land from an existing Village road
or a road which is to be dedicated to the Village shall obtain a permit
for the entrance prior to commencement of such construction. The construction
performed shall be in accordance with an entrance permit which has
been issued, to the satisfaction of the Superintendent of Highways.
Where driveway entrances involve ditch crossings
(see typical details for Type I local roads and major through roads),
the configuration of the driveway entrances shall be similar to that
shown in Figure No. 13, and the ditch shall be replaced with piping of adequate
size and strength to accept the flows and vehicle loadings anticipated.
The piping shall extend a minimum of 15 feet to either side of the
center line of the proposed entrance.
All driveways with a grade of 3% or greater
will be paved with blacktop as required by the Village Superintendent
of Highways or the Village Engineer, but in no instance shall the
grade of any proposed driveway exceed 15%.