[Amended 12-30-1976; 11-19-1990 by Ord. No. 14-1990; 3-16-1998 by Ord. No. 4-1998]
No excavation, which shall be defined as any act by which soil or rock is cut into, dug, quarried, uncovered, removed, displaced or relocated, within the Township of Byram shall be undertaken without first applying to the Construction Official of the Township for a permit and obtaining from said officer a permit in accordance with the requirements of this chapter. Excluded from this requirement will be any excavation made for the purpose of conducting percolation tests or soil logs; any which shall be a depth of less than five feet from the existing ground grade prior to the excavation; and any excavation which is being made pursuant to the activities permitted under a lawfully issued construction permit, soil removal permit or individual sewage disposal permit. The exemption allowed for excavation under a construction permit shall be all excavations necessary for construction (and to obtain a valid certificate of occupancy from the Township).