[Amended 7-22-2013 by Ord. No. 2013-08 (1123)]
In all areas of special flood hazards, compliance with the applicable
requirements of the Uniform Construction Code (N.J.A.C. 5:23) and
the following standards, whichever is more restrictive, is required:
A. Anchoring.
(1) All new construction and substantial improvements shall be anchored
to prevent flotation, collapse or lateral movement of the structure.
(2) All manufactured homes shall be anchored to resist flotation, collapse
or lateral movement. Methods of anchoring may include, but are not
limited to, use of over-the-top or frame ties to ground anchors. This
requirement is in addition to applicable state and local anchoring
requirements for resisting wind forces.
B. Construction materials and methods.
(1) All new construction and substantial improvements shall be constructed
with materials and utility equipment resistant to flood damage.
(2) All new construction or substantial improvements shall be constructed
using methods and practices that minimize flood damage.
C. Utilities.
(1) All new and replacement water supply systems shall be designed to
minimize or eliminate infiltration of floodwaters into the system.
(2) New and replacement sanitary sewerage systems shall be designed to
minimize or eliminate infiltration of floodwaters into the systems
and discharges from the systems into floodwaters.
(3) On-site waste disposal systems shall be located to avoid impairment
to them or contamination from them during flooding.
(4) Electrical, heating, ventilation, plumbing and air-conditioning equipment
and other service facilities shall be designed and/or located so as
to prevent water from entering or accumulating within the components
during conditions of flooding.
D. Subdivision proposals.
(1) All subdivision proposals and other proposed new development shall
be consistent with the need to minimize flood damage.
(2) All subdivision proposals and other proposed new development shall
have public utilities and facilities, such as sewer, gas, electrical
and water systems, located and constructed to minimize flood damage.
(3) All subdivision proposals and other proposed new development shall
have adequate drainage provided to reduce exposure to flood damage.
(4) Base flood elevation data shall be provided for subdivision proposals
and other proposed new developments which contain at least 50 lots
or five acres, whichever is less.
E. Enclosure openings. All new construction and substantial improvements
having fully enclosed areas below the lowest floor that are usable
solely for parking of vehicles, building access or storage in an area
other than a basement and which are subject to flooding shall be designed
to automatically equalize hydrostatic flood forces on exterior walls
by allowing for the entry and exit of floodwaters. Designs for meeting
this requirement must either be certified by a registered professional
engineer or architect or must meet or exceed the following minimum
criteria:
(1) A minimum of two openings having a total net area of not less than
one square inch for every square foot of enclosed area subject to
flooding shall be provided.
(2) The bottom of all openings shall be no higher than one foot above
grade.
(3) Openings may be equipped with screens, louvers or other coverings
or devices, provided that they permit the automatic entry and exit
of floodwaters.
In all areas of special flood hazards where base flood elevation data has been provided as set forth in §
31-7, Basis for establishing the areas of special flood hazard, or §
31-14B, Use of other base flood data and floodway data, the following provisions are required:
A. Residential construction.
[Amended 7-22-2013 by Ord. No. 2013-08 (1123)]
(1) All new construction and substantial improvement of any residential
structure located in an A or AE Zone shall have the lowest floor,
including basement, together with the attendant utilities and sanitary
facilities, elevated at least one foot above the base flood elevation
(published FIS/FIRM) or the best available flood hazard data elevation,
whichever is more restrictive;
(2) Require within any AO Zone on the municipality's FIRM, all new
construction and substantial improvement of any residential structure
shall have the lowest floor, including basement, elevated at least
one foot above the depth number specified in feet above the highest
adjacent grade (at least three feet if no depth number is specified)
or at least one foot above the best available flood hazard data elevation,
whichever is more restrictive, and require adequate drainage paths
around structures on slopes to guide floodwaters around and away from
proposed structures.
B. Nonresidential construction. Within an area of special flood hazard,
all new construction and substantial improvement of any commercial,
industrial or other nonresidential structure located in an A or AE
Zone shall have the lowest floor, including basement, together with
attendant utilities and sanitary facilities, either:
[Amended 7-22-2013 by Ord. No. 2013-08 (1123)]
(1) Elevated at least one foot above the base flood elevation (published
FIS/FIRM) or the best available flood hazard data elevation, whichever
is more restrictive; and
(2) Require within any AO Zone on the municipality's DFIRM, all
new construction and substantial improvement of any commercial, industrial
or other nonresidential structure shall either have the lowest floor,
including basement, elevated at least one foot above the depth number
specified in feet above the highest adjacent grade (at least three
feet if no depth number is specified) or at least one foot above the
best available flood hazard data elevation whichever is more restrictive,
and require adequate drainage paths around structures on slopes to
guide floodwaters around and away from proposed structures; or
(3) Be floodproofed so that below the base flood level plus one foot
or the best available flood hazard data elevation plus one foot (whichever
is more restrictive) the structure is watertight, with walls substantially
impermeable to the passage of water;
(4) Have structural components capable of resisting hydrostatic and hydrodynamic
loads and effects of buoyancy; and
(5) Be certified by a registered professional engineer or architect that the design and methods of construction are in accordance with accepted standards of practice for meeting the applicable provisions of this subsection. Such certification shall be provided to the Construction Code Official as set forth in §
31-14C(2).
C. Manufactured homes.
(1) Manufactured homes shall be anchored in accordance with §
31-17A(2).
(2) All manufactured homes to be placed or substantially improved within
an area of special flood hazard shall be elevated on a permanent foundation
such that the top of the lowest floor shall be at least one foot above
the base flood elevation (published FIS/FIRM) or the best available
flood hazard date elevation, whichever is more restrictive.
[Amended 7-22-2013 by Ord. No. 2013-08 (1123)]
Coastal high-hazard areas (V Zones or VE Zones) are located within the areas of special flood hazard established in §
31-7. These areas have special flood hazards associated with high-velocity waters from tidal surges and hurricane wave wash; therefore, the following provisions shall apply:
A. Location of structures.
(1) All buildings or structures shall be located landward of the reach
of the mean high tide.
(2) The placement of manufactured homes shall be prohibited, except in
an existing manufactured home park or subdivision.
[Amended 7-22-2013 by Ord. No. 2013-08 (1123)]
B. Construction methods.
(1) Elevation. All new construction and substantial improvements shall be elevated on piling or columns so that the bottom of the lowest horizontal structural member of the lowest floor, excluding the piling or columns, is elevated to or above the base flood elevation (published FIS/FIRM), the best available flood hazard data elevation, or as required by the Uniform Construction Code (N.J.A.C. 5:23), whichever is more restrictive, with all space below the lowest floor’s supporting member open so as not to impede the flow of water, except for breakaway walls as provided for in §
31-19B(4).
[Amended 7-22-2013 by Ord. No. 2013-08 (1123)]
(2) Structural support.
(a)
All new construction and substantial improvements shall be securely
anchored on piling or columns.
(b)
The pile or column foundation and structure attached thereto
shall be anchored to resist flotation, collapse or lateral movement
due to the effects of wind and water loading values, each of which
shall have a one-percent chance of being equaled or exceeded in any
given year (one-hundred-year mean recurrence interval).
(c)
There shall be no fill used for structural support.
(3) Certification. A registered professional engineer or architect shall develop or review the structural design specifications and plans for the construction and shall certify that the design and methods of construction to be used are in accordance with accepted standards of practice for compliance with the provisions of §
31-19B(1) and §
31-19B(2)(a) and
(b).
(4) Space below the lowest floor.
(a)
Any alteration, repair, reconstruction or improvement to a structure
started after the enactment of this chapter shall not enclose the
space below the lowest floor unless breakaway walls, open wood latticework
or insect screening are used as provided for in this section.
(b)
Breakaway walls, open wood latticework or insect screening shall
be allowed below the base flood elevation, provided that they are
intended to collapse under wind and water loads without causing collapse,
displacement or other structural damage to the elevated portion of
the building or supporting foundation system. Breakaway walls shall
be designed for a safe loading resistance of not less than 10 and
no more than 20 pounds per square foot. Use of breakaway walls which
exceed a design safe loading of 20 pounds per square foot (either
by design or when so required by local or state codes) may be permitted
only if a registered professional engineer or architect certifies
that the designs proposed meet the following conditions:
[1]
Breakaway wall collapse shall result from a water load less
than that which would occur during the base flood; and
[2]
The elevated portion of the building and supporting foundation
system shall not be subject to collapse, displacement or other structural
damage due to the effects of wind and water load acting simultaneously
on all building components (structural and nonstructural). Water loading
values used shall be those associated with the base flood. Wind loading
values used shall be those required by applicable state or local building
standards.
(c)
If breakaway walls are utilized, such an enclosed space shall
be used solely for parking of vehicles, building access, or storage
and not for human habitation.
(d)
Prior to construction, plans for any breakaway wall must be
submitted to the Construction Code Official or Building Sub-Code Official
for approval.
[Amended 7-22-2013 by Ord. No. 2013-08 (1123)]
C. Sand dunes. There shall be no man-made alteration of sand dunes within
Zones VE and V on the community's DFIRM which would increase
potential flood damage.