Each connection unit on each improved property
shall be connected separately to a service lateral through a building
sewer. Special written permission must be obtained from the Authority
to group more than one connection unit on one building sewer.
All costs and expenses of construction of a
building sewer and all costs and expenses of connection of a building
sewer to the collection sewer or service lateral shall be borne by
the owner of the improved property to be connected; and such owner
shall indemnify and save harmless this Township and Authority from
all loss or damage that may be occasioned, directly or indirectly,
as a result of construction of a building sewer or of connection of
a building sewer to the sewer lateral and/or collection sewer.
Materials for a building sewer, jointing materials and methods of installation shall be in accordance with requirements of this Part
2, and shall be subject to approval of this Authority.
The permit required by §
154-17 shall be displayed prominently upon the improved property to be connected to a sewer at all times during construction of the building sewer and connection of the building sewer to the service lateral and/or collection sewer.
Connections to the service laterals shall be
made of the same pipe diameter (size), properly joined. When the building
sewer is made with a pipe of larger diameter than the existing service
lateral, the building sewer shall be extended to the collection sewer
and connected with a saddle fitting.
All connections shall be made pursuant to §§
154-36 and
154-51 and the other provisions of this Part
2.
There will be charged and imposed upon the owner
of each connection unit a connection fee as set forth in the appropriate
resolutions adopted by the Authority from time to time. Such connection
fee shall be due and payable to the Authority at the time the connection
is made by the owners required to connect to the sewer by Authority
ordinance. If the owner fails to connect in the allotted time covered
by the ordinance, then the connection fee shall be due and payable
60 days, including the allotted time under the ordinance, after written
notice to connect is given to the owner by the Authority. Owners not
required to connect but who desire to do so shall pay the connection
fee at the time of permit application approval. Refer to Ordinance
5375, latest revision, for tabulation of user charges.
Any improved property upon which plumbing work is performed by an individual not possessing a permit as required under §
154-67 will not be approved for connection to a sewer.