All topsoil, soft spots, peat and other organic
material shall be stripped to their full depth, and boulders and ledge
rock shall be removed to a depth of at least 12 inches below finished
subgrade. The subgrade shall then be backfilled with bank-run gravel.
The gravel shall consist of sand, gravel and soil binder, free from
thin or elongated pieces, lumps or clay, soil, loam or vegetable matter
or stones larger than five inches in greatest dimension. The particles
shall be well graded from coarse to fine, and not more than 10% shall
pass the No. 200 sieve. All construction methods shall conform to
the requirements of the State Standard Specifications for Subgrade.