A.
General. Except as otherwise specified herein, all areas disturbed by construction of roads, drainage facilities and associated improvements that are not paved or occupied by structures shall be properly graded to smooth uniform slopes, covered with topsoil to a minimum depth, after settlement, of six inches and limed, fertilized, seeded and mulched.
B.
Materials and methods. All materials and construction methods shall conform to the requirements of the State Standard Specifications for Topsoil; Fertilizing, Seeding and Mulching; and Liming.