Definitions. For the purpose of this section, the following terms, phrases, words and their derivations shall have the meanings stated herein unless their use in the text of this chapter clearly demonstrates a different meaning. When not inconsistent with the context, words used in the present tense include the future, words used in the plural number include the singular number, and words used in the singular number include the plural number. The word "shall" is always mandatory and not merely directory. The definitions below are the same as or based on the corresponding definitions in the Stormwater Management Rules at N.J.A.C. 7:8-1.2.
AQUACULTUREThe propagation, rearing and subsequent harvesting of aquatic organisms in controlled or selected environments, and their subsequent processing, packaging and marketing, including but not limited to activities to intervene in the rearing process to increase production such as stocking, feeding, transplanting and providing for protection from predators.
BMPBest management practice as defined in the New Jersey Stormwater Best Management Practices Manual.
CAFRA CENTERS, CORES OR NODESThose areas with boundaries incorporated by reference or revised by the Department in accordance with N.J.A.C. 7:7-13.16.
CAFRA PLANNING MAPThe geographic depiction of the boundaries for Coastal Planning Areas, CAFRA Centers, CAFRA Cores and CAFRA Nodes pursuant to N.J.A.C. 7:7E-5B.3.
CERTIFICATIONEither a written statement signed and sealed by a licensed New Jersey professional engineer attesting that a BMP design or stormwater management system conforms to or meets a particular set of standards or to action taken by the Commission pursuant to N.J.A.C. 7:50-3, Part II or Part IV. Depending upon the context in which the term is used, the terms "certify" and "certified" shall be construed accordingly.
COMMUNITY BASINAn infiltration system, sand filter designed to infiltrate, standard constructed wetland, or wet pond, established in accordance with N.J.A.C. 7:8-4.2(c)14, that is designed and constructed in accordance with the New Jersey Stormwater Best Management Practices Manual, or an alternate design, approved in accordance with N.J.A.C. 7:8-5.2(g), for an infiltration system, sand filter designed to infiltrate, standard constructed wetland, or wet pond and that complies with the requirements of this chapter.
COMPACTIONThe increase in soil bulk density caused by subjecting soil to greater-than-normal loading.
CONSTRUCTIONThe construction, erection, reconstruction, alteration, conversion, demolition, removal or equipping of buildings, structures or components of a stormwater management system, including but not limited to collection inlets, stormwater piping, swales and all other conveyance systems, and stormwater BMPs.
CONTRIBUTARY DRAINAGE AREAThe area from which stormwater runoff drains to a stormwater management measure, not including the area of the stormwater management measure itself.
COREA pedestrian-oriented area of commercial and civic uses serving the surrounding municipality, generally including housing and access to public transportation.
COUNTY REVIEW AGENCYAn agency designated by the County Board of Chosen Freeholders to review municipal stormwater management plans and implementing ordinances. The county review agency may wither be:
(1) A county planning agency; or
(2) A county water resource association created under N.J.S.A. 58:16A-55.5, if the ordinance or resolution delegates authority to approve, conditionally approve, or disapprove municipal stormwater management plans and implementing ordinances.
DEPARTMENTThe New Jersey Department of Environmental Protection.
DESIGN ENGINEERA person professionally qualified and duly licensed in New Jersey to perform engineering services that may include, but not necessarily be limited to, development of project requirements, creation and development of project design and preparation of drawings and specifications.
DESIGNATED CENTERA State Development and Redevelopment Plan Center as designated by the State Planning Commission such as urban, regional, town, village, or hamlet.
DEVELOPMENT(1) The change of or enlargement of any use or disturbance of any land, the performance of any building or mining operation, the division of land into two or more parcels and the creation or termination of rights of access or riparian rights including, but not limited to:
(a) A change in type of use of a structure or land;
(b) A reconstruction, alteration of the size, or material change in the external appearance of a structure of land;
(c) A material increase in the intensity of use of land, such as an increase in the number of businesses, manufacturing establishments, offices or dwelling units in a structure or on land;
(d) Commencement of resource extraction or drilling or excavation on a parcel of land;
(e) Demolition of a structure or removal of trees;
(f) Commencement of forestry activities;
(g) Deposit of refuse, solid or liquid waste or fill on a parcel of land;
(h) In connection with the use of land, the making of any material change in noise levels, thermal conditions, or emissions of waste material; and
(i) Alteration, either physically or chemically, of a shore, bank, or floodplain, seacoast, river, stream, lake, pond, wetlands or artificial body of water.
(2) In addition, the construction, reconstruction, conversion, structural alteration, relocation or enlargement of any building or structure, any mining excavation or landfill, and any use or change in the use of any building or other structure, or land or extension of use of land, by any person, for which permission is required under the Municipal Land Use Law, N.J.S.A. 40:55D-1 et seq.
(3) In the case of development of agricultural land, i.e., lands used for an agricultural use or purpose as defined at N.J.A.C. 7:50-2.11, "development' means any activity that requires a state permit; any activity reviewed by the County Agricultural Boards (CAB) and the State Agricultural Development Committee (SADC), and municipal review of any activity not exempted by the Right to Farm Act, N.J.S.A. 4:1C-1 et seq.
(4) "Development" also means any reconstruction or altering of any service located on private property, except for residential lots with one single-family home, that is in direct contact with an existing storm drain inlet on that property only with respect to the storm drain retrofitting provisions of this section.
DISTURBANCEThe placement or reconstruction of impervious surface or motor vehicle surface, or exposure and/or movement of soil or bedrock or clearing, cutting, or removing of vegetation. Milling and repaving is not considered disturbance for the purposes of this definition.
DRAINAGE AREAA geographic area within which stormwater, sediments, or dissolved materials drain to a particular receiving water body or to a particular point along a receiving water body.
EMPOWERMENT NEIGHBORHOODA neighborhood designated by the Urban Coordinating Council in consultation and conjunction with the New Jersey Redevelopment Authority pursuant to N.J.S.A. 55:19-69.
ENVIRONMENTALLY CONSTRAINED AREAThe following areas where the physical alteration of the land is in some way restricted, either through regulation, easement, deed restriction or ownership such as wetlands, floodplains, threatened and endangered species sites or designated habitats, and parks and preserves. Habitats of endangered or threatened species are identified using the Department's Landscape Project as approved by the Department's Endangered and Nongame Species Program.
ENVIRONMENTALLY CRITICAL AREAAn area or feature which is of significant environmental value, including but not limited to stream corridors; natural heritage priority sites; habitats of endangered or threatened species; large areas of contiguous open space or upland forest; steep slopes; and wellhead protection and groundwater recharge areas. Habitats of endangered or threatened species are identified using the Department's Landscape Project as approved by the Department's Endangered and Nongame Species Program.
EROSIONThe detachment and movement of soil or rock fragments by water, wind, ice or gravity.
EXCEPTIONThe approval by the approving authority of a variance or other material departure from strict compliance with any section, part, phrase or provision of this section. An exception may be granted only under certain specific, narrowly defined conditions described herein and does not constitute a waiver of strict compliance with any section, part, phrase or provision of the Pinelands Comprehensive Management Plan (N.J.A.C. 7:50-1.1 et seq.).
EXTENDED DETENTION BASINA facility constructed through filling and/or excavation that provides temporary storage of stormwater runoff. It has an outlet structure that detains and attenuates runoff inflows and promotes the settlement of pollutants. An extended detention basin is normally designed as a multistage facility that provides runoff storage and attenuation for both stormwater quality and quantity management. The term "stormwater detention basin" shall have the same meaning as "extended detention basin."
FINISHED GRADEThe elevation of the surface of the ground after completion of final grading, either via cutting, filling or a combination thereof.
GRADINGModification of a land slope by cutting and filling with the native soil or redistribution of the native soil which is present at the site.
GREEN INFRASTRUCTUREA stormwater management measure that manages stormwater close to its source by:
(1) Treating stormwater runoff through infiltration into subsoil;
(2) Treating stormwater runoff through filtration by vegetation or soil; or
(3) Storing stormwater runoff for reuse.
GROUNDWATERWater below the land surface in a zone of saturation.
GROUNDWATER MOUNDING ANALYSISA test performed to demonstrate that the groundwater below a stormwater infiltration basin will not "mound up," encroach on the unsaturated zone, break the surface of the ground at the infiltration area or downslope, and create an overland flow situation.
HEAVY EQUIPMENTEquipment, machinery, or vehicles that exert ground pressure in excess of eight pounds per square inch.
HIGH POLLUTANT LOADING AREAAn area in an industrial or commercial development site where solvents and/or petroleum products are loaded/unloaded, stored, or applied; where pesticides are loaded/unloaded or stored; where hazardous materials are expected to be present in greater than "reportable quantities" as defined by the United States Environmental Protection Agency (EPA) at 40 CFR 302.4; where recharged would be inconsistent with NJDEP-approved remedial action work plan or landfill closure plan; and/or where a high risk exists for spills of toxic materials, such as gas stations and vehicle maintenance facilities The term "HPLA" shall have the same meaning as "high pollutant loading area."
HYDROLOGIC UNIT CODE 14 (HUC 14)An area within which water drains to a particular receiving surface water body, also known as a "subwatershed," which is identified by a fourteen-digit hydrologic unit boundary designation, delineated within New Jersey by the United States Geological Survey.
IMPERVIOUS SURFACEPursuant to N.J.A.C. 7:8-1.2, "impervious surface" means a surface that has been covered with a layer of material so that it is highly resistant to infiltration by water.
IN-LIEU CONTRIBUTIONA monetary fee collected by the Township of Galloway in lieu of requiring strict on-site compliance with the groundwater recharge, stormwater runoff quantity and/or stormwater runoff quantity standards established in this section.
INFILTRATIONThe process by which water seeps into the soil from precipitation.
INSTALLTo assemble, construct, put in place or connect components of a stormwater management system.
MAJOR DEVELOPMENT, NON-PINELANDS AREAS(1) For the purpose of this section only, an individual development, as well as multiple developments that individually or collectively result in:
(a) The disturbance of 1/4 or more acres of land since February 2, 2004;
(b) The creation of 1/4 acre or more of regulated impervious surface since February 2, 2004;
(c) The creation of 1/4 acre or more of regulated motor vehicle surface since March 2, 2021; or
(d) A combination of Subsection
(1)(b) and
(c) above that totals an area of 1/4 acre or more. The same surface shall not be counted twice when determining if the combination area equals 1/4 acre or more.
(2) Major development includes all developments that are part of a common plan of development or sale (for example, phased residential development) that collectively or individually meet any one or more of Subsection
(1)(a),
(b),
(c), or
(d) above. Projects undertaken by any government agency that otherwise meet the definition of "major development" but which do not require approval under the Municipal Land Use Law, N.J.S.A. 40:55D-1 et seq., are also considered major development.
MAJOR DEVELOPMENT, PINELANDS AREASAny division of land into five or more lots; any construction or expansion of any housing development of five or more dwelling units; any construction or expansion of any commercial or industrial use or structure on a site of more than three acres; or any development, grading, clearing or disturbance of an area in excess of 5,000 square feet.
MITIGATIONActs necessary to prevent, limit, remedy or compensate for conditions that may result from those cases where an applicant has demonstrated the inability or impracticality of strict compliance with the stormwater management requirements set forth in N.J.A.C. 7:8, in an adopted regional stormwater management plan, or in a local ordinance which is as protective as N.J.A.C. 7:8, and an exception from strict compliance is granted by the Township of Galloway and the Pinelands Commission.
MOTOR VEHICLEA land vehicle propelled other than by muscular power, such as automobiles, motorcycles, autocycles, and low-speed vehicles. For the purposes of this definition, motor vehicle does not include farm equipment, snowmobiles, all-terrain vehicles, motorized wheelchairs, go-carts, gas buggies, golf carts, ski-slope-grooming machines, or vehicles that run only on rails or tracks.
MOTOR VEHICLE SURFACEAny pervious or impervious surface that is intended to be used by motor vehicles and/or aircraft, and is directly exposed to precipitation including, but not limited to, driveways, parking areas, parking garages, roads, racetracks, and runways.
NEW JERSEY STORMWATER BEST MANAGEMENT PRACTICES MANUALThe manual maintained by the Department providing, in part, design specifications, removal rates, calculation methods, and soil testing procedures approved by the Department as being capable of contributing to the achievement of the stormwater management standards specified in this chapter. The BMP Manual is periodically amended by the Department as necessary to provide design specifications on additional best management practices and new information on already included practices reflecting the best available current information regarding the particular practice and the Department's determination as to the ability of that best management practice to contribute to compliance with the standards contained in this chapter. Alternative stormwater management measures, removal rates, or calculation methods may be utilized, subject to any limitations specified in this chapter, provided the design engineer demonstrates to the municipality, in accordance with Subsection
D(6) of this section and N.J.A.C. 7:8-5.2(g), that the proposed measure and its design will contribute to achievement of the design and performance standards established by this chapter.
NJDEPThe New Jersey Department of Environmental Protection.
NJPDESThe New Jersey Pollutant Discharge Elimination System as set forth in N.J.S.A. 58:10A-1 et seq. and in N.J.A.C. 7:14A.
NJPDES PERMITA permit issued by the NJDEP pursuant to the authority of the Water Pollution Control Act, N.J.S.A. 58:10A-1 et seq., and N.J.A.C. 7:14A for a discharge of pollutants.
NODEAn area designated by the State Planning Commission concentrating facilities and activities which are not organized in a compact form.
NONPOINT SOURCE(1) Any human-made or human-induced activity, factor, or condition, other than a point source, from which pollutants are or may be discharged;
(2) Any human-made or human-induced activity, factor, or condition, other than a point source, that may temporarily or permanently change any chemical, physical, biological, or radiological characteristic of waters of the state from what was or is the natural, pristine condition of such waters, or that may increase the degree of such change; or
(3) Any activity, factor, or condition, other than a point source, that contributes or may contribute to water pollution.
(4) The term "NPS" shall have the same meaning as "nonpoint source."
NONSTRUCTURAL BMPA stormwater management measure, strategy or combination of strategies that reduces adverse stormwater runoff impacts through sound site planning and design. Nonstructural BMPs include such practices as minimizing site disturbance, preserving important site features, reducing and disconnecting impervious cover, flattening slopes, utilizing native vegetation, minimizing turf grass lawns, maintaining natural drainage features and characteristics and controlling stormwater runoff and pollutants closer to the source. The term "low-impact development technique" shall have the same meaning as "nonstructural BMP."
NUTRIENTA chemical element or compound, such as nitrogen or phosphorus, which is essential to and promotes the development of organisms.
PERMEABILITYThe rate at which water moves through a saturated unit area of soil or rock material at hydraulic gradient of one, determined as prescribed in N.J.A.C. 7:9A-6.2 (tube permeameter test), N.J.A.C. 6.5 (pit bailing test) or N.J.A.C. 6.6 (piezometer test). Alternative permeability test procedures may be accepted by the approving authority, provided the test procedure attains saturation of surrounding soils, accounts for hydraulic head effects on infiltration rates, provides a permeability rate with units expressed in inches per hour and is accompanied by a published source reference. Examples of suitable sources include hydrogeology, geotechnical, or engineering text and design manuals, proceedings of American Society for Testing and Materials (ASTM) symposia, or peer-review journals. Neither a soil permeability class rating test, as described in N.J.A.C. 7:9A-6.3, nor a percolation test, as described in N.J.A.C. 7:9A-6.4, are acceptable tests for establishing permeability values for the purpose of complying with this section.
PERMEABLEHaving a permeability of one inch per hour or faster. The terms "permeable soil," "permeable rock" and "permeable fill" shall be construed accordingly.
PERSONAny individual, corporation, company, partnership, firm, association, municipality or political subdivision of this state subject to municipal jurisdiction pursuant to the Municipal Land Use Law, N.J.S.A. 40:55D-1 et seq.
PINELANDS CMPThe New Jersey Pinelands Comprehensive Management Plan (N.J.A.C. 7:50-1.1 et seq).
POINT SOURCEAny discernible, confined, and discrete conveyance, including, but not limited to, any pipe, ditch, channel, tunnel, conduit, well, discrete fissure, container, rolling stock, concentrated animal feeding operation, landfill leachate collection system, vessel, or other floating craft, from which pollutants are or may be discharged. The term does not include return flows from irrigated agriculture.
POLLUTANTAny dredged spoil, solid waste, incinerator residue, filter backwash, sewage, garbage, refuse, oil, grease, sewage, sludge, munitions, chemical wastes, biological materials, medical wastes, radioactive substance [except those regulated under the Atomic Energy Act of 1954, as amended (42 U.S.C. § 2011 et seq.)], thermal waste, wrecked or discarded equipment, rock, sand, cellar dirt, industrial, municipal, agricultural, and construction waste or runoff, or other residue discharged directly or indirectly to the land, groundwaters or surface waters of the state, or to a domestic treatment works. "Pollutant" includes both hazardous and nonhazardous pollutants.
PROFESSIONAL ENGINEERA person licensed to practice professional engineering in the State of New Jersey pursuant to N.J.S.A. 45:8-27 et seq.
RAIN GARDENA man-made landscaped depression, or bioretention area, for the use of collecting, filtering and infiltrating stormwater from small storm events.
RECHARGEThe amount of water from precipitation that infiltrates into the ground and is not evapotranspired.
REGULATED IMPERVIOUS SURFACE(1) Any of the following, alone or in combination:
(a) A net increase of impervious surface;
(b) The total area of impervious surface collected by a new stormwater conveyance system (for the purpose of this definition, a "new stormwater conveyance system" is a stormwater conveyance system that is constructed where one did not exist immediately prior to its construction or an existing system for which a new discharge location is created);
(c) The total area of impervious surface proposed to be newly collected by an existing stormwater conveyance system; and/or
(d) The total area of impervious surface collected by an existing stormwater conveyance system where the capacity of that conveyance system is increased.
REGULATED MOTOR VEHICLE SURFACE(1) Any of the following, alone or in combination:
(a) The total area of motor vehicle surface that is currently receiving water;
(b) A net increase in motor vehicle surface; and/or quality treatment either by vegetation or soil, by an existing stormwater management measure, or by treatment at a wastewater treatment plant, where the water quality treatment will be modified or removed.
REPLICATEOne of two or more soil samples or tests taken at the same location (within five feet of each other) and depth, within the same soil horizon or substratum. In the case of fill material, replicate tests are tests performed on subsamples of the same bulk sample packed to the same bulk density.
SANDA particle size category consisting of mineral particles which are between 0.05 millimeters and 2.0 millimeters in equivalent spherical diameter. Also, a soil textural class having 85% or more of sand and a content of silt and clay such that the percentage of silt plus 1/5 times the percentage of clay does not exceed 15, as shown on the USDA Soil Textural Triangle.
SEASONALLY HIGH WATER TABLEThe upper limit of the shallowest zone of saturation which occurs in the soil, identified as prescribed in N.J.A.C. 7:9A-5.8.
SEDIMENTSolid material, mineral or organic, that is in suspension, is being transported, or has been moved from its site or origin by air, water or gravity as a product of erosion.
SITEThe lot or lots upon which a major development is to occur or has occurred.
SOILAll unconsolidated mineral and organic material or any origin.
SOURCE MATERIALAny material(s) or machinery, located at an industrial facility that is directly or indirectly related to process, manufacturing or other industrial activities, which could be a source of pollutants in any industrial stormwater discharge to groundwater. Source materials include, but are not limited to, raw materials; intermediate products; final products; waste materials; by-products; industrial machinery and fuels, and lubricants, solvents, and detergents that are related to process, manufacturing, or other industrial activities that are exposed to stormwater.
SPECIAL WATER RESOURCE PROTECTION AREASPursuant to N.J.A.C. 7:8-5.5(h), special water resource protection areas shall be established along all waters designated Category One at N.J.A.C. 7:9B and perennial or intermittent streams that drain into or upstream of the Category One waters as shown on the USGS Quadrangle. Areas shall be established for the protection of water quality, aesthetic value, exceptional ecological significance, exceptional recreational significance, and exceptional fisheries significance of those established Category One waters.
STATE PLAN POLICY MAPThe geographic application of the State Development and Redevelopment Plan's goals and statewide policies, and the official map of these goals and policies.
STORM DRAIN INLETAn opening in a storm drain used to collect stormwater runoff and includes, but is not limited to, a grate inlet, curb-opening inlet, slotted inlet, and combination inlet.
STORMWATERWater resulting from precipitation (including rain and snow) that runs off the land's surface, is transmitted to the subsurface, or is captured by separate storm sewers or other sewage or drainage facilities, or conveyed by snow removal equipment.
STORMWATER INFILTRATION BMPA basin or other facility constructed within permeable soils that provides temporary storage of stormwater runoff. An infiltration BMP does not normally have a structural outlet to discharge runoff from the stormwater quality design storm. Instead, outflow from an infiltration BMP is through the surrounding soil. The terns "infiltration measure" and "infiltration practice" shall have the same meaning as "stormwater infiltration basin."
STORMWATER MANAGEMENT BASINAn excavation or embankment and related areas designed to retain stormwater runoff. A stormwater management basin may either be normally dry (that is, a detention basin or infiltration basin), retain water in a permanent pool (a retention basin), or be planted mainly with wetland vegetation (most constructed stormwater wetlands).
STORMWATER MANAGEMENT MEASUREAny structural or nonstructural strategy, practice, technology, process, program, or other method intended to control or reduce stormwater runoff and associated pollutants, or to induce or control the infiltration or groundwater recharge of stormwater or to eliminate illicit or illegal nonstormwater discharges into stormwater conveyances.
STORMWATER MANAGEMENT PLANNING AREAThe geographic area for which a stormwater management planning agency is authorized to prepare stormwater management plans, or a specific portion of that area identified in a stormwater management plan prepared by that agency.
STORMWATER RUNOFFWater flow on the surface of the ground or in storm sewer resulting from precipitation.
STREAM CORRIDORThat land lying within 50 feet of the edge of any stream, pond or lake or within 25 feet of the center of any intermittent stream.
SUITABLE SOILUnsaturated soil, above the seasonally high water table, which contains less than 50% by volume of coarse fragments and which has a tested permeability rate of between one and 20 inches per hours.
TIDAL FLOOD HAZARD AREAA flood hazard area in which the flood elevation resulting from the two-, ten-, or 100-year storm, as applicable, is governed by tidal flooding from the Atlantic Ocean. Flooding in a tidal flood hazard area may be contributed to, or influenced by, stormwater runoff from inland areas, but the depth of flooding generated by the tidal rise and fall of the Atlantic Ocean is greater than flooding from any fluvial sources. In some situations, depending upon the extent of the storm surge from a particular storm event, a flood hazard area may be tidal in the 100-year storm, but fluvial in more frequent storm events.
TIME OF CONCENTRATIONThe time it takes for runoff to travel from the hydraulically most distant point of the drainage area to the point of interest within a watershed.
TOTAL SUSPENDED SOLIDSThe insoluble solid matter suspended in water and stormwater that is separable by laboratory filtration in accordance with the procedure contained in the Standard Methods for the Examination of Water and Wastewater prepared and published jointly by the American Public Health Association, American Water Works Association and the Water Pollution Control Federation. The term "TSS" shall have the same meaning as "total suspended solids."
URBAN ENTERPRISE ZONEA zone designated by the New Jersey Enterprise Zone Authority pursuant to the New Jersey Urban Enterprise Zones Act, N.J.S.A. 52:27H-60 et seq.
URBAN REDEVELOPMENT AREAPreviously developed portions of areas:
(1) Delineated on the State Plan Policy Map (SPPM) as the Metropolitan Planning Area (PA1), Designated Centers, Cores or Nodes;
(2) Designated as CAFRA Centers, Cores or Nodes;
(3) Designated as Urban Enterprise Zones; and
(4) Designated as Urban Coordinating Council Empowerment Neighborhoods.
VOID RATIOThe interstitial space between soil particles as calculated by the ratio of the volume of voids to the volume of solids.
WATER CONTROL STRUCTUREA structure within, or adjacent to, a water, which intentionally or coincidentally alters the hydraulic capacity, the flood elevation resulting from the two-, ten-, or 100-year storm, flood hazard area limit, and/or floodway limit of the water. Examples of a water control structure may include a bridge, culvert, dam, embankment, ford (if above grade), retaining wall, and weir.
WATERS OF THE STATEThe ocean and its estuaries, all springs, streams, wetlands, and bodies of surface water or groundwater, whether natural or artificial, within the boundaries of the State of New Jersey or subject to its jurisdiction.
WELLA bored, drilled or driven shaft, or a dug hole, which extends below the seasonally high water table and which has a depth which is greater than its largest surface dimension.
WET PONDA stormwater facility constructed through filling and/or excavation that provides both permanent and temporary storage of stormwater runoff. It has an outlet structure that creates a permanent pool and detains and attenuates runoff inflows and promotes the settling of pollutants. A stormwater retention basin can also be designed as a multistage facility that also provides extended detention for enhanced stormwater quality design storm treatment and runoff storage and attenuation for stormwater quantity management. The term "stormwater retention basin" shall have the same meaning as "wet pond."
WETLANDSPursuant to N.J.A.C. 7:8-1.2, "wetlands" or "wetland" means an area that is inundated or saturated by surface water or groundwater at a frequency and duration sufficient to support, and that under normal circumstances does support, a prevalence of vegetation typically adapted for life in saturated soil conditions, commonly known as "hydrophytic vegetation."