[Amended 2-11-2008 by Ord. No. 08-070; at time of adoption of Code (see Ch. 1, General Provisions, Art. I)]
It shall be the duty of the Planning Board to make and adopt a Comprehensive Plan of the City and to perfect it from time to time. Such Comprehensive Plan shall show existing and desirable streets, highways, street grades, bridges and tunnels, viaducts, public places, parks, parkways, playgrounds, roadways in streets and parks, sites for public buildings and structures, use and building zones, waterways, routes of railroads and buses, locations of sewers, water conduits and other public utilities and other planning features. Such Comprehensive Plan shall be established, added to and changed from time to time by a majority vote of the Planning Board members in attendance when adoption of the plan is considered. It shall be a public record, but its purpose and effect shall be solely to aid the Planning Board in the performance of its duties.
A. Changes in Comprehensive Plan. Whenever the Planning Board shall have adopted a Comprehensive Plan or any part thereof, then and thenceforth no street, park or other public way, ground, place or space and no public building or structure shall be constructed or authorized in the City and no change shall be made in the Zoning Map of the City of Bangor until and unless the location and extent thereof and the suggested change of the Zoning Map shall have been submitted to the Planning Board and until the Planning Board shall have made its report on any such matter submitted to it.
B. Failure of Board to act. The failure of the Planning Board to act within 30 days from and after the date of submission to it of such proposition as aforesaid shall be deemed to be its approval of any such matter, unless a longer period is granted by the municipal officers.