Type of Fee | Amount | ||
|---|---|---|---|
Permit application filing and review fee | $200 nonrefundable fee due at time of application submission | ||
Building permit fee | 1.5% of the estimated cost of the construction up to $1,000,000, anything over $1,000,000 will be 1% of the estimated cost | ||
Demolition of entire structure | $1,000 flat fee | ||
Interior demo | $450 | ||
Demo pool | $450 (plumbing permit for removal of existing plumbing) | ||
Plumbing | $150 first 3 fixtures, $50 each additional | ||
Gas test | $75 | ||
Generator | $150 for the first unit, $50 each additional, and plumbing permit required | ||
Certificate of occupancy | |||
New dwelling | $200 | ||
Temporary (only good for 60 days) | $150, then $200 for final certificate of occupancy | ||
Certificate of completion | $200 | ||
Temporary | $150, then $200 for final certificate of completion | ||
Title search | $100 (When a title company requests the Village to do a title search on a property of all permits, opened and closed, any violations on the property and copies of all certificates of occupancy and certificates of completion) | ||
Remedial fee. Notwithstanding any other provision of this section, where any applicant for a building permit, or certificate of occupancy or completion, is made for approval or authorization of or for any work or activity which has already been commenced or completed, and for which an approval was required to be obtained prior to commencement or completion, the fee required for such application shall be three times the fee which would have been required had the permit or approval been obtained on a timely basis. Upon a showing of exigent circumstances which justify the failure to make timely application for, or timely obtain, such permit or approval, the Board of Trustees, in its sole discretion, may waive the additional fee required by this paragraph in whole or in part. | |||
Revised building permit (where there is no increase in estimated cost of the work due to the revision; where revision results in an increase in the estimated cost of the work, the fee due shall be in accordance with the calculation for the building permit inspection fees set forth in this chapter) | $200 | ||
Permit renewal | |||
First renewal | 25% of original permit fee | ||
Second renewal | 50% of original permit fee | ||
Subsequent renewal | Amount payable for original permit at current rate chargeable under this chapter | ||
Piling and foundation | $250 | ||
Plumbing and heating | $100 | ||
AC/HVAC | $150 for the first unit, $50 each additional and 1% of the cost of installation | ||
Moving building | $1,000 per day, plus restoration costs | ||
Fence | $100 | ||
Swimming pool | $750 flat fee plus $150 for the certificate of completion | ||
Tennis court | $750 flat fee plus $150 for the certificate of completion | ||
Land subdivision | |||
Sketch plan | $500 | ||
Preliminary plat (per lot) | $1,000 | ||
Final plat (per lot) | $1,000 | ||
Waiver | $500 plus filing | ||
Any engineering expenses are not to exceed an additional $3,000 | |||
Board of Appeals | |||
Variances and special permits | $2,000 | ||
Applications to maintain existing conditions shall be two times the application fee for a variance and special permit | |||
Preparation or review of environmental impact statement | 1/2 of 1% of action's total cost | ||
Dog redemption fee | |||
First offense: not more than | $100 | ||
Second offense: not more than | $200 | ||
Third offense: not more than | $300 | ||
Street Openings, per cut | |||
Permit fee | $1,000 | ||
Cash deposit | |||
First 150 square feet of area to be restored | $7,500 | ||
Each additional 100 square feet or part thereof | $1,000 | ||
Curbing | Cost of survey and specifications to be paid by applicant, plus street opening fee | ||
Auctions, per day | $250 | ||
Other than auctions (tag sales), per day | $250 | ||
Licensing of gardeners | |||
For 1 truck | $25 | ||
Each additional truck or trailer | $15 | ||
Temporary storage containers (§ 150-52.1) | $50 | ||
Parking of commercial vehicles (§ 140-26.1) | $10 | ||
Architectural advisory application fee (AAC fee) | |||
Regulation application | $300 | ||
Public hearing, if needed | $500 | ||
Driveway permit | $200 application fee; cost calculations are as follows: $0.25 per square foot | ||
Paving permit other than a driveway | $200 application fee; cost calculations are as follows: $1.00 per square foot for the first 500 square feet and $0.50 each additional square foot | ||
Swimming pool patio | $1.00 per square foot for the first 500 square feet and $0.50 for each additional square foot | ||
Accessory building/structure - accessory buildings under 100 square feet | $200 | ||